Laserfiche WebLink
4 ESTIMATED POLLUTANT LOAD REDUCTION MODEL USED: <br /> For estimating watershed loading, exclusive of the RO Concentrate addition, the Spreadsheet Tool for Estimating Pollutant <br /> Loads (STEPL) was initially applied, with the land use breakdown as previously noted. In developing these loads, grass <br /> swales and dry detention were noted as the existing BMP elements. Event Mean Concentrations used were those applied to <br /> Florida conditionsz shown in Table I of the Pollutant Load Calculations Attachment, which are similar to the default values <br /> within the STEPL model. Load projections for the entire watershed are noted in Table 2 of the Pollutant Load Calculations <br /> Attachment. <br /> There is available long term USGS flow data for the PC-South Relief Canal which represents the composite influence of the <br /> runoff and base flow associated with the majority of the watershed. Data from 1956 to 1982"reveals an annual average flow <br /> of 37.7 cfs or 24.4 MGD, with a standard deviation of 13.7 cfs (8.9 MGD); a minimum annual average of 15.2 cfs (9.8 <br /> MGD) and a maximum annual average of 61.6 cfs (39.8 MGD). Using the average flow rates and the STEPL post BMP <br /> loading values,the average annual concentrations within the canal can be estimated,as noted in Table 3 of the Pollutant Load <br /> Calculations Attachment. Included in this table is the actual concentrations as monitored in the South Canal, using data from <br /> USGS from 1972-1977, from Indian River Farms Water Control District from 2000,and from the ongoing PC-South ATSrM <br /> Pilot System. <br /> F <br /> M�#I (AT <br /> ed TSS TP TN <br /> MS) I lbs/yr ib yr lbs/ r <br /> Pre-Project 33,851 7,400 36,834 <br /> R7 Post- <br /> Project 16,925 4,998 27,229 <br /> w Load <br /> 2 Reduction 16,926 2,402 9,607 <br /> A <br /> . <br /> 50% 32.5% 26.1 <br /> TSS TP TN <br /> lbs/ r lbs/ r lbs/ r 16,925 4,998 27,229 <br /> 8,463 4,953 27,004 <br /> Reduction 8,463 45 225 <br /> o; <br /> Reduction 50% 0.9% 0.8% <br /> TOTAL TSS TP TN <br /> lbs/yr lbs/yr lbs/ r <br /> y Pre-Project 33,851 7,400 36,834 <br /> ------------------- <br /> ost- <br /> Project 8,462 4,953 27,004 <br /> � Load <br /> Reduction 25,389 2,447 9,830 <br /> a° % <br /> Reduction 75.0% 33.1% 26.7% <br /> ESTIMATED RESIDENCE TIME OF ANY PONDS,SWALES,ETC.: This Section is not applicable. The pollutant <br /> reduction occurs on the algal turf scrubber flow-way. <br /> 3 CDM,"Little Wekiva Basin Watershed Management Plan"2005 Orange County,Florida. <br /> USGS Station 02253500 Lat 27°36' 11";Long 80°23'24" <br /> 41n 1982 RO Concentrate discharge to the canal was initiated and flows reflect this addition after 1982. <br /> DEP Agreement No.G0353,Attachment A-1,Page 4 of 14 <br /> 136 <br />