My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br /> No. .5 <br /> DATE OF ISSUANCE: 7/17/2013 EFFECTIVE DATE: 7/1212013 <br /> OWNER: Indian River County <br /> CONTRACTOR: Guettler Construction <br /> Bid No: 2012302 <br /> Project:66 Avenue Roadway Improvements —Phase 2 (4�' Street to 16'h Street) <br /> OWNER's Contract No. 2012032 ENGINEER's Contract No. 9810-B <br /> ENGINEER: Indian River County <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Remove and reset 18"RCP culvert crossing as shown on the"66th Avenue Plan and Profile Phase 2" <br /> construction plan sheet 25 dated 2/15/12 at Sta. 19+80. Revise the proposed MES-16 invert elevation <br /> from 19.4'to elevation 17.98'. Revise the outfall east invert elevation from 17.50'to elevation 17.79'and <br /> furnish and install a flap gate at the drainage ditch. <br /> Purpose of Work Change Directive: <br /> To preserve the historic drainage characteristics and match the original 18"CMP culvert crossing which <br /> was removed under 660i Avenue. <br /> Attachments: <br /> me-16 pipe and flap gate.pdf price quote e-mail from Ben Guettler dated 7/11/2013. <br /> If OWNER or CONTRACTOR believe that the above.change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> 7 Unit Prices II Contractor's Records <br /> II Lump Sum n Engineer's Records <br /> x Other-.Work Price Quote f]Other. <br /> II By Change Order II By Change Order. <br /> Estimated increase in Contract Price: Estimated increase in Contract Times:0 <br /> $4,300,00 Substantial Completion:462 <br /> Ready for Final Completion:492 <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: APPROVED- <br /> By: <br /> PR ED-By: By: <br /> CONT CTOR(Signature) ENGINEER(Signa re) NER ne) <br /> Date: �nl Date: `7 7 `� Dat <br /> R\Public WorksIENGTNEER1NG DTVISION PR0JECrSl98T0B-66tb Ave Ph 2 4th St to 76th SMc mimlWork Change DirectivuN"20-Work Change Dired`e 103 <br /> ei Am <br />
The URL can be used to link to this page
Your browser does not support the video tag.