Laserfiche WebLink
66th Ave Change Order .Proposal REV7252013 3:06;13PM <br /> Guettler Brothers Construction LLC. <br /> 4401 Whiteway Dairy Rd. <br /> Fort Pierce FL 34949 <br /> Contact: Ben Guettler <br /> Phone: 772461-8345 <br /> Fu: 772461-8039 <br /> note To: Indian River County lob Name: 66th Ave Graves Driveway <br /> 1801 27th Street Eneineer Carter and Associates <br /> Vero Beach FL 32960 Date of Plans: Email Received 7/19/13 <br /> Phone: 772-567-8000 Rcvision Date: <br /> FM Location Vero Beach FL <br /> E Mail- dlcrith@kcgov.com <br /> Attu. Don Keith <br /> Prices Good for 7 Days From Date quoted <br /> ITEM DESCREMON QUANTITY UNIT UNIT PRICE AMOUNT <br /> 101-1 Mobilization(No Charge) 1.00 LS <br /> 102-1 MOT(IfNeeded to be billed at the end of the job) 4.00 DAY 16200 64$.00 <br /> 120 4-B Embauk3nent 1,266.00 CY 1 4-50 5,697.00 <br /> 1604-A I2"Stabr7urd Subgrade 1,375.00 SY 200 2,750.00 <br /> 2.96-14 Turnout Construction(Pavement) 78.00 SY 1750 1,365.00 <br /> 350-2-1 6"Coucreft Reinforced 34.00 SY 25.00 850.00 <br /> 522-2 6"Concrete Sidewalk -1330 SY 24.00 -31920 <br /> 5500-926 24'Swing Cates 1.00 EA 1,780.00 1,780_DO <br /> 570-12 Seed and Mulch 3,000.00 SY 0.50 1,500.00 <br /> 108-1 Survey&Asbuilts 1.00 LS 2,167.00 2,167.00 <br /> GRAND TOTAL 516,43780 <br /> NOTES: <br /> MOT is based on a 4 Day Tune Extension. <br /> Fill Quantity is based on 597.49'x 55 Wide x 1.5'Avg Depth <br /> Mobilization is based on working s>multaneously with the road construction <br /> All other items such as curb,C,hamlink fence,Sod,etc,shall be ovemms to the exfistiv pay items. <br /> Page 1 of 1 <br /> 106 <br />