Laserfiche WebLink
SECTION 00948 -Work Change Directive <br /> No. 7 <br /> DATE OF ISSUANCE: 8/05/2013 EFFECTIVE DATE: 8/05/2013 <br /> OWNER: Indian River County <br /> CONTRACTOR: Guettler Construction <br /> Bid No: 2012302 <br /> Project: 6Avenue Roadway Improvements —Phase 2 (4'h Street to 16th Street) <br /> OWNER's Contract No. 2012032 ENGINEER's Contract No. 9810-B <br /> ENGINEER: Indian River County <br /> You are directed to proceed promptly with the following changes- <br /> Description: <br /> Construct and install a new 24'wide (approx)driveway(8" stabilized subgrade, 6" coquina base)that ties <br /> in with the Atlantic Boulevard re-alignment as shown on the"66th Avenue Plan and Profile Phase 2 Atlantic <br /> Boulevard'construction plan sheet 46 revision dated 4/16/13. <br /> Purpose of Work Change Directive: <br /> To provide safe ingress and egress into Nicole Grice West's horse pasture being impacted by the 66th <br /> Avenue construction. <br /> Attachments: <br /> Atlantic changes rev 3.pdf price quote e-mail from Ben Guettler dated 7/24/2013. <br /> "66th Avenue Plan and Profile Phase 2 Atlantic Boulevard" plan sheet 46 revision No_2 dated 4/16/13. <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> L1,Unit Prices II Contractor's Records <br /> F] Lump Sum II Engineers Records <br /> x Other.Work Price Quote Q Other. <br /> 0 By Change Order. F1 By Change Order. <br /> Estimated increase in Contract Price: Estimated increase in Contract Times:.9'2 <br /> $30.669.00 Substantial Complebon:AK—;/9/ Y-30-13 <br /> Ready for Final Completion:49Z-5. l i0-3o-13 <br /> If the change involves an increase, the estimated If the change involves an increase, the esti ated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: PPROVE <br /> By: B y;?� jBy: <br /> CONTRACTOR (Signature) ENGINEER(Signature) NER <br /> Date: LR�r3 Date: 8 �' Date: <br /> FAlublic WorWENGWEDUNG DTVIS)ON PRQTECTS\98)OM6th AVC.Ph 2 4th St to 36th SMd�\Wod C h=p DuectivmILMO-Work cump Du==, Oq <br /> 97.doc <br />