My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Van Fleet Water Production Facility Improvements 13VP 13-196 <br /> VALUE ADDED PLAN (SAMPLE ONLY) <br /> This template should be used. The Value Added (VA) Plan should identify any value added options or <br /> ideas that may benefit the County. The value added claims should be prioritized (identify the most <br /> important claims first). The Contractor may add or delete Value Added Claim table templates, but do not <br /> exceed the 2-page limit for this section. Do not include any identifying information in the VA Plan. <br /> Information listed under the "Documented Performance" line may describe where the Contractor has <br /> used the approach or solution previously, and what the results were in terms of verifiable metrics. Only <br /> use percentages of base costs for each claim. Do not include any dollar amounts. Contractor should note <br /> whether the claim is an additive or deductive change. <br /> Example: <br /> Keroulli►t,this bifiltling gill unl stop all eater leak.N. the urajurih njthe• <br /> leaks are cause cl h v cracks is the lnrrape► rn•ulLs, broken missing glus,%. <br /> Item Claim: (110pourc•arIlkiug <br /> 1101% will this add value? <br /> llus a11proac•11 ill 1 siliiilcur prgjec is has irurkrcl /00"I') of the lime in <br /> Documented Performance: mopping till leaks <br /> Cost Impact 0.-'5Q1,, Schedule Impact ('%o): U.25 <br /> Item #1 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact (%): Schedule Impact(%): <br /> Item #2 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact{%): <br /> Item #3 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact (%): Schedule Impact (%): <br /> Item #4 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact(%): <br /> Item #5 Claim: <br /> How will this add value? <br /> Documented Performance: <br /> Cost Impact(%): Schedule Impact(%): <br /> 33 <br /> 156 <br />
The URL can be used to link to this page
Your browser does not support the video tag.