My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> HSPs and one(1)2,500 gpm(3.6 mgd)jockey pump, with piping connections and space <br /> for a third 4,000 gpm pump for future installation. All pumps will be powered by Variable <br /> Frequency Drives(VFDs). <br /> b. Provide ductile iron HSP suction and discharge piping, valves and accessories and tied <br /> into below grade yard piping. <br /> c. Provide valves, fittings and appurtenances for HSP station recirculation piping system and <br /> surge control/pressure regulating valve station. <br /> d. Provide a new exterior concrete slab/foundation(without roof)for the HSP station. <br /> e. Demolish the existing high service pumps, associated piping, electrical and controls, and <br /> the hydropneumatic tank. <br /> 4. Process Area 400 Disinfection <br /> a. Obtain the services of the designated Chemical Equipment Supplier to furnish and install a <br /> temporary liquid Sodium Hypochlorite System including metering pump skids,tanks, <br /> piping, injectors, fill station, controls and other accessories for maintaining Raw Water <br /> Disinfection and Finished Water Trim Disinfection during demolition of the existing <br /> chemical facilities and construction of the new chemical facilities. <br /> b. Demolish the existing Chemical Facilities and construct a new pre-engineered metal <br /> Chemical Storage Building. <br /> c. Obtain the services of the designated Chemical Equipment Supplier to furnish and install <br /> new liquid Sodium Hypochlorite metering pump skids,tanks, piping, injectors, fill station, <br /> controls and other accessories for a new Raw Water Disinfection system and a new <br /> Finished Water Trim Disinfection system in the new Chemical Storage Building. <br /> d. Remove Temporary Chemical Facility and restore ground. <br /> 5. Process Area 500 Corrosion Control <br /> a. Obtain the services of the designated Chemical Equipment Supplier to furnish and install <br /> new metering pump skids,tank, piping, injector, fill station, controls and other accessories <br /> for a new Polyorthophosphate Storage and Feed system in the new Chemical Storage <br /> Building. <br /> 6. Process Area 700 Civil/Site and Miscellaneous Improvements <br /> a.New automated site entrance vehicle slide gate and personnel access swing gate and <br /> building access with"Cyberlock" Key Entry. <br /> b. Site Surveillance System for monitoring all structure access points connected via new <br /> fiber optic conduit from the system to the property line for future optic connection. 6 <br /> camera locations will be provided. <br /> c. Demolish and remove existing yard piping serving the existing high service pumps and <br /> 250,000 gallon GSR, existing generator and fuel tanks, and septic tank(currently <br /> abandoned). <br /> d. Demolish existing metal Process Building and replace with a new Chemical Storage <br /> Facility. <br /> e. Driveway, sidewalk, site grading and landscaping. <br /> 7. Process Area 800 Electrical Power and Instrumentation and Control (I&C) System <br /> a. Upgrade/replace the primary electrical service and electrical distribution system to be <br /> housed in a new pre-manufactured electrical building, lightning protection, exterior <br /> lighting for new pump locations,well pump control system and replace the existing <br /> Motorola ACE Remote Terminal Unit(RTU)for the four(4)HSPs with new PLC based <br /> SCADA. <br /> b. Demolish and remove existing generator package and fuel system. Provide new Diesel <br /> 5 <br /> I -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.