My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> Upon completion of the blind evaluation and compilation of all scores,the Evaluation Committee <br /> shall make a determination on elevation of Contractors for Interviews, as noted below in Section <br /> 3.2. <br /> 3.2 INTERVIEWS <br /> The County may shortlist(if necessary)the top rated Contractors. The shortlisted Contractors <br /> may be required to participate in an interview. The County may interview all Critical Team <br /> Members, including(but not limited to): <br /> • Project Manager <br /> • Site Superintendent <br /> • Instrumentation &Controls Contractor <br /> The County may also request to interview additional personnel. The County will interview <br /> individuals separately (and may perform a group interview after the individual interviews are <br /> completed). The individuals interviewed must be the same individuals for whom PPI's were <br /> submitted. No other individuals (from the Contractor) will be allowed to sit in or participate <br /> during the interviews. The County may request additional information prior to interviews. All <br /> proposed Critical Team Members must be available in person for interviews on the date specified <br /> in this Solicitation. At the County's discretion, substitutes, proxies, phone interviews, or <br /> electronic interviews may be allowed. Individuals who fail to participate in the interview will <br /> not be given a score which may jeopardize the Contractor's competitiveness. <br /> 3.3 COST PROPOSAL—BASE COST <br /> Contractors are to submit a competitive Cost Proposal based upon the base specifications and <br /> scope provided by the County. Base Cost, as defined in Section 2.5 c, is the value of the Project <br /> before any value added options are incorporated. All Value Added options proposed by the <br /> Contractor are to be excluded from the Base Cost. The pricing will be the Base Cost and will not <br /> be negotiated (excluding inclusion/exclusion of value added options or adjustments in County <br /> scope requirements or needs during the Pre-Award Phase). <br /> Cost Proposal must not contain any names that can be used to identify who the Contractor is <br /> (such as company names, personnel names, project names, or product names). <br /> Cost Reasonableness <br /> After ranking all of the Contractors based on the selection criteria,weights, and ratings,the <br /> County will verify if the BV Contractor meets the following requirements: <br /> • If the highest ranked Contractor is within 5%of the next highest ranked Contractor's cost, <br /> then the highest ranked Contractor will be invited to the Pre-Award Phase. <br /> • If the highest ranked Contractor cost is more than 5% greater than the second highest ranked <br /> Contractor's cost,the County reserves the right to invite the second highest ranked <br /> Contractor to the Pre-Award Phase. <br /> • If the highest ranked Contractor's cost is more than 5 %below the average Contractor's cost, <br /> the County reserves the right to proceed to the next Contractor. <br /> 16 <br /> In - 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.