Laserfiche WebLink
® G. K. ENVIRONMENTAL, INC. <br /> Environmental Consulting <br /> GEORGE R.KULC7_YCKI,CI C,CB,CLI <br /> 155 McKee Lane <br /> Vero Beach,FL 32960 <br /> Phone 772-567-9129 <br /> Fax 772-567-6245 <br /> Email Rkc(r�mc.com <br /> G. K. Environmental, Inc. Fee Schedule & GKE Subcontractor Fee Schedule <br /> 10/1/13-9/30/15 <br /> G. K. Environmental,Inc. Fee Schedule <br /> President, Principal Ecologist........................................................... $120.00/hour(or lump sum) <br /> Administrative Assistance................................................................. $ 45.00/hour(or lump sum) <br /> GKE boat/fuel/associated sampling equipment............................ $ 65.00/hour(or lump sum) <br /> Phase I Audits/Environmental Site Assessments...................... GKE Standard Fee: <br /> (includes historic aerial site reviews/onsite inspections, $2,975.00(<5.0 acre site) <br /> and evaluations of hazardous waste,preliminary endangered& <br /> threatened species, and approximate wetland locations) <br /> GKE reimbursement expenses............................................. photo b/w copies$0.15; <br /> photo color copies$0.45; <br /> postage:per postage invoice <br /> G. K.Environmental,Inc. Subcontractor Coordination and Supervision Services Fee Schedule <br /> Landscape&Maintenance Service......................................... per bid/event <br /> Archaeological Service...................................................... per bid/event <br /> CADOperator..................................................................................... $ 70.00 per hour <br /> Field Assistant I. ................................................................................ $ 40.00 per hour <br /> Field Assistant Il Biologist/Chemist.. $ 75.00 per hour <br /> A� �0 ) <br /> September 30, 2013 <br /> G rge R. tilcryc &ZI t, cip ologist Date <br /> 56 <br />