My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942- Change Order Form NO. 2 <br /> DATE OF ISSUANCE: October 8, 2013 EFFECTIVE DATE: October 8, 2013 <br /> OWNER: Indian River County <br /> CONTRACTOR Guettler Brothers Construction, LLC. <br /> Bid No. 2012032 <br /> Project: 66 AAvenue Roadway Improvements— Phase 2 (4`h Street to 160, Street) <br /> Project No. 9810-B <br /> ENGINEER Indian River County <br /> You are directed to make the following changes in the Contract Documents: <br /> Description: This change order is intended to make adjustments to bid line items and address Work <br /> Directives as well as to recover lost days due to the additional work in the work directives, weather delays <br /> and utility re-location delay time. This change order also includes an additional 8" water transmission <br /> main. <br /> Reason for Change Order: The increased contract costs are due to adjustments to landscape and <br /> irrigation modifications, 4`h Street underdrain modifications, miscellaneous drainage modifications, and <br /> other miscellaneous modifications- The increased contract costs are also due to an additional 8" water <br /> transmission main that is intended to loop the system to provide better pressure in the area. <br /> Attachments: <br /> 1. Work Change Directives-2 through 7 <br /> 2. Itemized changes <br /> 3. (Revised Utility Plans), titled: 66 Avenue Roadway Improvements, Ph. 2, dated: January 2012, <br /> S&S August 9,2013. <br /> CHANGE IN CONTRACT CHANGE IN CONTRACT <br /> PRICE: TIMES <br /> Description Amount Description Time <br /> Original Contract Price $7,498,095.00 Original Contract Time: (days/dates) <br /> Substantial Completion: 330 4-18-13 <br /> Final Completion: 360 5-18-13 <br /> Net Increase from previous $162,402.94 Net change from previous <br /> Change Order, No. 1 Change Order, No. 1 (days) <br /> 102 days <br /> Contract Price prior to this $7,660,497.94 Contract Time prior to this <br /> Change Order: Change Order: ( (days/dates) <br /> Substantial Completion: 432 8-1-13 <br /> Final Completion: 462 8-31-13 <br /> Net increase of this Change $182,209.80 Net increase(decrease)this <br /> Order: Change Order: (days or dates) <br /> 167 days <br /> Contract Price with all $7,842,707.74 Contract Time with all approved <br /> approved Change Orders: Change Orders: (days/dates) <br /> Substantial Completion: 599 1-22-14 <br /> Final Completion: 629 2-21-14 <br /> ACCEPTED: RECO E ED: APPROVED: <br /> r <br /> By: Gj l?C� By: <br /> CONTRACTOR(Signature) EN INFER(Signature) OWNER(Signature) <br /> QDate: 2 !3 Date: `1'a --l3 1 Date: <br /> 00942-Change Order No.2, 10-5-13 92 <br /> 00942-1 F:1Riblic WorkMENGINEERING DMSION PROJECTS19810B-66th Ave Ph 2 4th St to 16th SMdrn1MTHANGE ORDERSOM2-Change Order No.2. 10-&13.doc <br />