My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
11/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:52:59 AM
Creation date
3/23/2016 9:05:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2013
Meeting Body
Board of County Commissioners
Book and Page
215
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NU.tif
SmeadsoftID
14235
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item# Item Description Estimated Quantity Unit Unit Price Total Price <br /> 530-9-106b Communication Duct Installer(Onsite) 4.00 HR $75.00 $300.00 <br /> 630-5-13-36 Conduit,2"PVC @ 36",Hand Trench(F&I) 40.00 LF $6.25 $250.00 <br /> 630-6-12-db Directional Bore,2"HDPE(F&I) 525.00 LF $11.95 $6,273.75 <br /> 630-7-MT Detectable Marking Tape(F&I) 1,050.00 LF $0.75 $787.50 <br /> 630-7-JL Jet Line(F&I) 1,050.00 LF $0.15 $157.50 <br /> 630-7-ROW ROW Delineator Marker Post Orange 6"(F&I) 5.00 EACH $85.00 $425.00 <br /> 635-8-121TR Pullboxes 17"x30"x12"W/Lid Traffic Rated(F&I) 2.00 EACH $595.00 $1,190.00 <br /> 633-4-113-96 FO Cable 96F SM LT UG(F&I) 1450 LF On IRC 0.00 LF $1.95 $0.00 <br /> Courthouse To Southern Bell Proposal Required For <br /> SONET Connection <br /> 633-8-96A-1 FO Term.Housing 96F Wall/Rack(F&I) 1.00 EACH $6,395.00 $6,395.00 <br /> 633-8-96A FO Splice Closure 96F Aerial/UG(F&I) 1.00 EACH $3,975.00 $3,975.00 <br /> 633-8-B OTDR Test Any Wavelength Bare Fiber FOSC(Install 192.00 EACH $8.00 $1,536.00 <br /> Only) <br /> Total Price for above 16th Ave To Alley Behind So.Bell Items: $22,229.75 <br /> Total Bid Price: $67,084.65 <br /> Notes: <br /> • Location: Indian River County, FL <br /> Fiber Optic modifications At 14Separate Sites To Facilitate The SONET Redesign. <br /> • PCS quotes the LIG-Aerial Installation,splicing,termination,testing,and re-routing of a fiber circuit though the locations listed to replace existing <br /> IRC SONET equipment. <br /> • PCS Proposal is not mutually exclusive. Contract to include ALL PCS proposed items @ proposed unit prices. <br /> • PCS will Mobilize a total of(1)one time for the proposed work after noticed by the contractor. Additional Mobilizations will be billed as additions to <br /> contract at$500 per Mobilization. <br /> • PCS has NOT included any provisions for a performance bond. <br /> • Sales or use tax has been included for all materials. <br /> • PCS will require(10)ten work days to perform the proposed work. <br /> • Proposed pricing is based on award of all items bid upon. PCS reserves the to modify unit prices if all quoted items are not awarded. <br /> PCS will provide MOT for the immediate work area of their crews as required by the MUTCD. however any MOT requiring lane closures,detours, <br /> traffic diversions or police officers necessary for the safe performance of work by PCS is to be handled by Others. <br /> PCS requires 30 days written notice for project scheduling. <br /> • All conduits,cable tray,pull boxes,manholes,ladder racks,man hole racks,risers,entrances and/or poles must be installed and tied in by OTHERS <br /> prior to PCS starting work. PCS only includes installation or furnish and installation of fiber optic components and specifically EXCLUDES all <br /> infrastructure hardware unless specifically included in specific pay items expressly for the specific infrastructure. PCS is not responsible for damage <br /> by others to FO Cable or other equipment after placement by PCS.Contractor must allow sufficient time for Subcontractor to complete its scope of <br /> work after access to raceways is given. <br /> ' Proposed pricing is based on award of all items bid upon. PCS reserves the right to modify unit prices if all quoted items are not awarded. Prices <br /> are only valid for 90 days of the bid date. PCS reserves the right to modify or withdraw their offer if either a letter of intent or a contract is not <br /> received within 90 days of the bid date. <br /> This proposal in its entirety and including all notes of clarification shall be added as an addendum to any resulting contract for the referenced <br /> project. If any of the PCS notes of clarification conflict with the contract provisions,the PCS notes shall supercede the contract provisons and <br /> govern accordingly. <br /> • PCS is not responsible for damage by others to FO Cable or other equipment after placement by PCS. <br /> • PCS is a certified MWBE Contractor with specific agencies. It is the bidders responsibility to verify PCS's current status prior to utilizing this proposal <br /> to meet required contract goals. <br /> • Warranty: Transition Network electronic equipment is not part of this proposal and is assumed to be purchased by the customer,and will be <br /> under warranty for the first year per the warranty agreement directly with Transition Networks-Not PCS. <br /> • Maintenance: First year maintenance will be time and material from the IRC Master Contract with PCS. Second year maintenance will be <br /> negotiated under a seperate proposal. <br /> • At the South Tower Location: PCS quotes the termination of(3)three 96F SM cables. This proposal does not include splice housings, <br /> Connector housings,or coupler panels and assumes that they are existing as per the customer. <br /> • At the South Tower Location: When the installation of fiber optic cable is included within PCS's scope of work,All conduit,cable tray,pull <br /> boxes,risers,entrances and/or poles must be installed and tied in by OTHERS prior to PCS begining work. <br /> • At the 16th Ave.to Alley Way behind Southern Bell: This does not include the fiber optic cable. THe fiber optic cable for this location is on a <br /> seperate proposal. <br /> Payment Terms: <br /> Payment terms:NET 30 Days and 18%APR for balances exceeding 30 Days. <br /> 11/5/2013 8:20:03 AM Page 3 of 4 <br /> 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.