Laserfiche WebLink
Indian River County Landfill <br /> Cell 1 East-West Rain Flap Removal <br /> "f► Bid Form(Note 1) <br /> Estimated Unit <br /> Item Description Quantity Unit Cost Cost <br /> (Note 11) <br /> I MobilizationMemobilization(Note IIn 1 Lump Sum '55*0o 3$'b0 <br /> 2 Liquid Dewatering/Purnping(Note IV) TBD Truckloads Z.ZS'U 22.-Yo <br /> 3 Rain Flap Removal(Note V) 3 Days 3 S 00 l D S'Oo <br /> 4 Materials(Note VI) 1 Lump Sum $75- g7 S' <br /> 5 Sligo Submersible Pump(SSR Series 1 PSF)(Note VII) l Lump Sum 'Z Soo z SDO <br /> Total I? (,ZS <br /> Notes: <br /> I Bidders shall provide list of equipment proposed for the construction activities incleuding earthwork and geosynthetics for the work <br /> described in this Bid Form and shown on the Construction Drawings. Bidders shall also include the names and addresses of <br /> subconsultants they propose for this project. <br /> U Quantities presented herein are estimated quantities and should be verified by Contractor. If quantities are found to be different, <br /> Contractor shall notify Engineer and Owner prior to starting work. Quantities that are not provided and that are within the scope of <br /> work shall be estimated and verified by Contractor and brought to Engineers attention. <br /> IH Mobilization/demobilization shall not exceed 205'"of the total bid price. <br /> IV TBD=to be determined.This item is optional and may or may not be required.This item involves potential dewateringtpumping of <br /> liquids that may have been accumulated,due to recent rainfall events,within the southern portion of Cell I(i.e.,area of Cell 1 south <br /> of the east-west rain flap)as shown on the Construction Drawings. Liquids shall be pumped to a tanker truck and transported to the <br /> Bio-solids facility for disposal which is approximately 3,300 A(0.62 miles)one-way from the rain flap location. Contractor shall <br /> provide unit cost for a tanker truck to pomp and transport liquids to the Bio-solids facility,which is located at the landfill facility. The <br /> tanker truck should have the capability to pump the liquids into the truck. However,the landfill operator has two pumps(one 3-in. <br /> pump and one 6-in.pump that could be used if necessary. <br /> V Contractor shall provide equipment and labor for the removal of rain flap as shown on the Construction Drawings. Equipment used <br /> shall be approved by the Engineer prior to being used. The sand along the rain flap shall be carefully removed to expose the tie-in <br /> point between the flap and the cell liner. The flap shall be cut away from the cell liner carefully to avoid any puncturing of the liner <br /> system. Upon flap removal,the geocomposite that had been bent up behind the flap shall be folded down flat onto the liner against <br /> the existing geocomposite termination point In order to patch the geocomposite back together prior to reinstalling the sand cover, <br /> place a cap strip of geotextile(8-oz/sy minimum)or approved equivalent over the seam and sew it into position. The Contractor shall <br /> ensure that no sand will infiltrate the geocomposite in the area of the patch The Contractor shall also provide the required geotextile <br /> material.Any excess sand from the rain flap/berm shall be sporead and graded into the as-constructed liner protective layer of the <br /> southern portion of Cell 1. <br /> This item also includes the connection of the leachate collection line as shown in the Construction Drawings.This shall be <br /> accomplished by cutting and cleaning both ends of the pipe at the liner flap location;providing a spool piece(approximately 7 R long) <br /> of 6-in.dia.SDR 11 HDPE pipe and two electro fusion couplers;and connecting the pipe together. The Contractor shall provide <br /> geotextile material to connect the leachate collection"burrito wrap"and shall place the leachate collection gravel around the pipe in <br /> the burrito prior to sewing the geotextile overlap. The Owner will provide the gravel needed to the tie-in location but the Contractor <br /> shall be responsible for placing the geotextile-gravel burrito as shown on the Construction Drawings. The Engineer has estimated <br /> three days for this work;Contractor shall indicate the number of days required for this work <br /> VI This item includes the following materials needed for the project:(i)6-in.dia.SDR 1 I HDPE spool pieces;(ii)two 6-in.dia.electro <br /> fusion couplers;and(iii)8-oz/sy nonwoven geotextile required for the geocomposite tie-in point cap st*and for tying the leachate <br /> collection system gravel burrito together. The Owner will provide the gravel required to complete the burrito wrap.Approximately <br /> 3.6 cy of gravel will be required to constructed the pipe-gravel burrito in this section;this gravel should be obtained from the rain flap <br /> berm along the leachate corridor plus a small stockpile on site. <br /> VIl The Contractor shall provide this leachate pump(see attached Cut Sheet)which will be used as a back-up pump for Cell 1.This is a <br /> submersible pump for leachate collection in the side slope riser of Cell 1. This item is optional and the Owner may elect to have this <br /> purchased as part of this contract. <br /> 188 <br />