My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
11/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:52:59 AM
Creation date
3/23/2016 9:05:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2013
Meeting Body
Board of County Commissioners
Book and Page
215
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NU.tif
SmeadsoftID
14235
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> DATE: 10-28-13 REQUISITION NO. <br /> TO: Purchasing Division <br /> FROM: Manuel Cabo —Telecom Department (Division Head Signature) <br /> SUBJECT: Request for approval of"No Substitute". Sole Source, Sole Brand, or Single Source <br /> ITEM AND DESCRIPTION: NEC SV8100 Key telephone system replacement for IRC <br /> Sandridge Golf Course location. <br /> We request approval of a "NO SUBSTITUE" specification for the purchase of the subject item(s) <br /> for the indicated below: (Check or fill in one reason only.) <br /> ❑ 1. Item(s) is (are) only acceptable replacement part(s) known for: (Identify) <br /> ® 2. Item must be physically or chemically compatible with: (Identify with existing item and <br /> explain) System must be compatible with other NEC telephone systems currently deploy <br /> throughout IRC, and capable of being added to existing IRC telephonesystems <br /> maintenance & support contract with NEC. <br /> ❑ 3. Only item(s) approved by authorized evaluation for the use intended: (Explain) <br /> ❑ 4. Process or material storage compatibility: (Explain) <br /> ❑ 5. Parts and attachments interchangeability: (Explain) <br /> ❑ 6. Material and job interchangeability: (Explain) <br /> ❑ 7. Continuity of design: (Explain) <br /> ❑ 8. Other: (Explain) <br /> Approval recommended: <br /> ❑ Yes ❑ No Comment: <br /> Manager,Purchasing Division <br /> Revised Dec.2004 <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.