PREPARED FOR: <br /> 3.7 EMBANKMENT <br /> 4.3 TRENCH EXCAVATION <br /> A. CONSTRUCT EMBANKMENTTO THE LINES AND GRADE SHOWN ON THE <br /> DRAWINGS. A. DIG TRENCH TO LINES AND GRADES SHOWN ON THE PLANS OR AS <br /> S. CONSTRUCT EMBANKMENT FROM ON-SRE EXCAVATION MATERIALS WHEN DIRECTED BY CONSTRUCTION MANAGER. Sprint' <br /> SUITABLE USE IMPORTED BACKFILL ONLY AFTER AVAILABLE ON-SRE B. TRENCH LENGTH SHALL BE SUFFICIENT TO ALLOW FOR SATISFACTORY <br /> EXCAVATION MATERIALS HAVE BEEN USED. CONSTRUCTION AND INSPECTION OF THE PROJECT WITHOUT ENDANGERING OTHER <br /> C. CONSTRUCT IN LIFTS OF NOT MORE THAN 12 INCHES IN LOOSE DEPTH. CONSTRUCTION WORK OR ADJACENT FACILITIES. <br /> THE FULL WIDTH Of THE CROSS SECTION SHALL BE BROUGHT UP UNIFORMLY. C. DISPOSE OF EXCESS AND UNSUITABLE EXCAVATION MATERIAL PROPERLY, <br /> D. MATERIAL SHALL NOT BE PLACED IN LAYERS AND SHALL BE NEAR AS DIRECTED BY CONSTRUCTIO MANAGER. <br /> OPTIMUM MOISTURE CONTENT BEFORE ROLLING TO OBTAIN THE PRESCRIBED D. USE HAND METHODS FOR EXCAVATION THAT CANNOT BE ACCOMPLISHED <br /> COMPACTION.WETTING DR DRYING OF THE MATERIAL AND MANIPULATION TO WITHOUT ENDANGERING EXISTING OR NEW STRUCTURES OR OTHER FACILITIES. 1 INTERNATIONAL BOULEVARD <br /> SECURE A UNIFORM MOISTURE CONTENT THROUGHOUT THE LAYER MAY BE SUITE #800 <br /> REQUIRED.SUCH OPERATIONS SHALL BE INCLUDED IN THE APPROPRIATE BID 4.4 TRENCH PROTECTION MAHWAH, N.J. 07495 <br /> ITEM.SHOULD THE MATERIAL BE TOO WET TO PERMIT PROPER COMPACTION, IT IS <br /> THE CONTRACTOR'S RESPONSIBILITY TO UTILIZE MATERIAL WITH AN ACCEPTABLE A. PROVIDE MATERIALS,LABOR AND EQUIPMENT NECESSARY TO PROTECT <br /> CONSULTANT: <br /> MOISTURE CONTENT. TRENCHES AT ALL TIMES. <br /> E. DO NOT PLACE FROZEN MATERIAL IN THE EMBANKMENT AND DO NOT B. SHEETING AND BRACING: MEET OR EXCEED OSHA REQUIREMENTS. m <br /> PLACE EMBANKMENT MATERIAL UPON FROZEN MATERIAL. , <br /> F. CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY OF 4.5 BACKFILLING <br /> MORRISON HER6H 245, <br /> iwMP4n <br /> EMBANKMENTS AND THE REPLACEMENT OF ANY PORTION WHICH HAS BECOME Tw Said ury ,sM1e 345, <br /> DISPLACED DUE TO THE CONTRACTORS OPERATIONS, A. NOTIFY THE CONSTRUCTION MANAGER AT LEAST 24 HOURS IN ADVANCE -,Lab24 <br /> G. START LAYERS IN THE DEEPEST PORTION OF THE FILL,AND AS OF BACKFILLING. Tet B5131T.4S5.5 F. QU.M.48M <br /> PLACEMENT PROGRESSES,CONSTRUCT LAYERS APPROXIMATELY PARALLEL TO THE B. BACKFILL TRENCH WITH LIFTS UP TO 12 INCHES,LOOSE MEASURE. STAT!O.R ACO/0554e5M <br /> FINISHED GRADE LINE. C. PROTECT CONDUIT FROM LATERAL MOVEMENT,DAMAGE FROM IMPACT OR www.ma4eonneMMN.mm <br /> H. ROUTE EOUIPMENT,BOTH LOADED AND EMPTY.OVER THE FULL WIDTH UNBALANCED LOADING TO AVOID DISPLACEMENT OF CONDUIT AND/OR <br /> OF EMBANKMENT TO ENSURE UNIFORMITY OF MATERIAL PLACEMENT. STRUCTURES.DO NOT FREE FALL BACKFILL INTO TRENCH UNTIL AT LEAST 12 <br /> I. COMPACT EMBANKMENT UNDERLYING NEW GRAVEL PAVING FLOOR SLABS INCHES OF COVER IS OVER THE CONDUIT. <br /> AND STRUCTURES TO A 95 PERCENT COMPACTION AT A MAXIMUM DRY DENSITY <br /> AS DETERMINED BY ASTM 0-1557 OR WITHIN PLUS OR MINUS 3 PERCENT OF 4.6 COMPACTION SITE NAME: <br /> OPTIMUM MOISTURE CONTENT.COMPACT NON-STRUCTURAL AREA EMBANKMENTS. GIFFORD WATER TANK <br /> TO A MINIMUM OF 90%OF ASTM 0-1557. A. COMPACT BACKFILL TO A 95 PERCENT COMPACTION AT A MAXIMUM DRY <br /> DENSITY AS DETERMINED BY ASTM 0-1557 OR WITHIN PLUS OR MINUS J <br /> 3.8 SITE GRADING PERCENT OF OPTIMUM MOISTURE CONTENT. SITE NUMBER: <br /> 8. IF REQUIRED COMPACTION DENSITY HAS NOT BEEN OBTAINED.REMOVE MIGOXCZ4O <br /> A. USING ON-SITE EXCAVATION MATERIALS SHAPE.TRIM, FINISH AND THE BACKFILL FROM THE TRENCH OR STRUCTURE,REPLACE WITH APPROVED <br /> COMPACT SURFACE AREAS TO CONFORM TO THE LINES,GRADES AND CROSS BACKFILL AND RECOMPACT AS SPECIFIED. <br /> SECTIONS SHOWN ON THE DRAWINGS OR AS DESIGNATED BY THE CONSTRUCTION C. ANY SUBSEQUENT SETTLEMENT OF TRENCH OR STRUCTURE BACKFILL SITE ADDRESS: <br /> MANAGER. DURING ANY <br /> PERIOD SHALL BE CONSIDERED THE RESULT OF IMPROPER 4690 28TH CT. <br /> B. GRADE SURFACES TO DRAIN AND ELIMINATE ANY PONDING OR EROSION. COMPACTION AND SHALL BE PROMPTLY CORRECTED. VERO BEACH, FLORIDA 32948 <br /> C. ELIMINATE WHEEL RUTS BY REGRADING. <br /> D. COMPACT AREAS UNDERLYING NEW GRAVEL PAVING,FLOOR SLABS AND 5.0 GROUNDING IAN V N <br /> STRUCTURES TO A 95 PERCENT COMPACTION AT A MAXIMUM DRY DENSITY AS <br /> DETERMINED BY ASTM D-1551 OR WITHIN PLUS OR MINUS 3 PERCENT OF MEET ALL APPLICABLE CODES,REQUIREMENTS OF THE CONSTRUCTION M <br /> OPTIMUM MOISTURE CONTENT. DOCUMENTS AND SPRINT WIRELESS CONSTRUCTION SPECIFICATIONS. ` ZO.�3 <br /> E. CONSTRUCT FINISHED SURFACE OF SITE GRADING AREAS WITHIN ONE <br /> INCH FROM SPECIFIED GRADE /� rQi ` `411111111 4YF Y <br /> ``J ` 1I <br /> 3.9 SUBGRADE PREPARATION 13 J .�`y P N••W <br /> A. SHAPE TOP OF SUBGRADE TO THE LINES AND GRADES SHOWN ON THE °^ C E N <br /> DRAWINGS. °n^V, o•" <br /> B. MAINTAIN TOP OF SUBGRADE TO A GREE-DRAINING CONDITION, <br /> NO. 622099 <br /> C. DO NOT STOCKPILE MATERIALS ON TOP OF SUBGRADE UNLESS <br /> AUTHORIZED BY CONSTRUCTION MANAGER. <br /> D. COMPACT THE TOP 12 INCHES OF SUBGRADE TO A 95%COMPACTION ° STATE OF Q--= <br /> AT A MAXIMUM DRY DENSITY AS DETERMINED BY ASTM 0-1557 OR WITHIN PLUS �� • ° �� <br /> OR MINUS 3 PERCENT OF OPTIMUM MOISTURE CONTENT. "° P°"e E. CONSTRUCT TOP OF SUBGRADE WITHIN ONE INCH 01 ESTABLISHEDs6i6 <br /> COR)GRADE AND CROSS-SECTION.3.10 GEOTE%TILE FABRIC <br /> A. LAY GEOTE)MLE FABRIC OVER COMPACTED SUBGRADE AS PER <br /> CONSTRUCTION fISTIE_ <br /> DOCUMENTS IN THE COMPOUND AREA AND UNDER LENGTH OF c <br /> TERED ENGNEER <br /> ROAD(WHEN REQUIRED). LAP ALL JOINTS TO A MINIMUM Of 36 INCHES, STATE OF CLoaKIA <br /> PEMY[O9 <br /> 3.11 GRAVEL SURFACING <br /> A. CONSTRUCT GRAVEL SURFACING AREAS USING CRUSHED AGGREGATE e <br /> BASE AND FINISH COURSES AS SPECIFIED BY CONSTRUCTION MANAGER OR <br /> CONSTRUCTION DOCUMENTS. �w��'�'°���"0�"" e <br /> 8. SPREAD GRAVEL AND RAKE TO OBTAIN A UNIFORM SURFACE AREA. <br /> DRAWN BY:WJ DATE DRAWN:05/12/12 <br /> 4.0 TRENCHING REVIEWED BY: CC I APPROVED BY: I RL <br /> CALL LOCAL UNDERGROUND UTILITY LOCATING SERVICEABLE BEFORE ANY MH PROJECT#:7123001.00 <br /> EXCAVATION OR TRENCHING. <br /> REVISION <br /> 4.1 MATERIALS NO DESCRIPTION BY DATE <br /> A 90%CD SUBMITTAL WJ 05/14/12 <br /> FILL MATERIAL SHALL BE OBTAINED,WHEN POSSIBLE FROM MATERIALS 0 FINAL HU 07/25/12 <br /> EXCAVATED FROM TRENCHES.ON-SITE STRUCTURAL FILL SAND OR SLURRY SHALL <br /> BE APPROVED BY THE CONSTRUCTION MANAGER AND SHALL CONFORM TO LOCAL 1 FINAL WJ 09/27/12 <br /> 2 V.S.G.COMMENTS CA 06/12/13 <br /> GOVERNING JURISDICTIONS AND UTILITY COMPANY REQUIREMENTS.THE FILL <br /> MATERIAL SHALL CONTAIN NO ORGANIC MATERIAL OR ROCKS.NOR SHALL CONTAIN <br /> OBJECTIONABLE MATERIALS AND/OR MATERIALS DESIGNATED AS HAZARDOUS OR im <br /> INDUSTRIAL BY THE ENVIRONMENTAL PROTECTION AGENCY(EPA).THE FILL <br /> MATERIAL SHALL CONTAIN FINES SUFFICIENT TO FILL ALL VOIDS IN THE MATERIAL <br /> SHEEP TITLE: <br /> COMPACTION OF BACKFILL OR BORROW SOIL SHALL BE PLACED IN 12 INCH <br /> LOOSE LIFTS WHEN UTILIZING HEAVY COMPACTION EQUIPMENT OR 6 INCH LOOSE GENERAL NOTES <br /> LIFTS WHEN UTILIZING HAND OPERATED TAMPERS. <br /> 4.2 PIPE DETECTION AND IDENTIFICATION SHEET NUMBER: <br /> A. UTILIZING WARNING TAPE:ALL ELECTRIC SERVICEABLE TRENCHES SHALL T-3 <br /> BE MARKED WITH WARNING TAPE. <br />