My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
11/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:52:59 AM
Creation date
3/23/2016 9:05:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2013
Meeting Body
Board of County Commissioners
Book and Page
215
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NU.tif
SmeadsoftID
14235
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREPARED FOR- <br /> NOTES- <br /> CON RACTOR <br /> OR:NOTES-CONTRACTOR TO FIELD VERIFY ANTENNA FIBER OPTIC CABLE LENGTHS. <br /> ALL MAIN FIBER OPTIC CABLES WILL BE COLOR CODED AT THREE (3) <br /> LOCATIONS. <br /> COLOR CODE ALL ANTENNA AND FIBER OPTIC WITH 2'WIDE BANDS OF • <br /> COLORED TAPE WITH 1'SEPARATION BETWEEN BANDS. Sprint' <br /> COLOR CODE ALL TOP AND BOTTOM GROUND KITS WITH 1'WIDE BANDS " <br /> OF COLORED TAPE WITH 1/2"SEPARATION BETWEEN BANDS. <br /> START COLOR BANDS 2"BEYOND WEATHERPROOFING. <br /> START SECTOR COLOR NEXT TO ENO CONNECTOR. <br /> ALL MAW FIBER OPTICS CABLES WILL BE GROUNDED W/COAXIAL CABLE 1 INTERNATIONAL BOULEVARD <br /> TOP OF EXISTING WATER TANK GROUND KITS AT: SUITE JJ. 0 <br /> INSTALL SEAL WELDED THE ANTENNA LEVEL MAHWAH, N.J. 07495 <br /> NEW BALCONY PIPE ELEV. 3156-8"AGL MID LEVEL IF TOWER I$OVER 200' <br /> MOUNTS(TYP.) BASE OF TOWER PRIOR TO TURNING HORIZONTAL <br /> TERMINATION OF FIBER OPTIC LINES TO JUMPERS CONSULTANT: <br /> ALL NEW GROUND BAR DOWNLEADS ARE TO BE CADWELDED TO THE m <br /> C.L.OF PROPOSED EXISTING SPRINT PANEL ANTENNA EXISTING ADJACENT GROUND BAR DOWNLEADS A MINIMUM DISTANCE OF ■L <br /> EV. 133-6 ACL 4FT BELOW GROUND BAR [Pei <br /> PROVIDE BUSS BAR NEAR BTS FOR ATTACHMENT OF FIBER OPTIC CABLE MORRISON HERSHPIELO <br /> GROUND KITS Tvn seen U-1,_.Sure z4s, <br /> PMbtlm.FLC55J24 <br /> C.L. OF EXISTING T-MOBILE ANTENNA TK 951.517.4555 Fe M.577.ee55 <br /> ELEV. 3130'-0"AGL ANT NNA FIB R OPTI e8 NOTES STAre OF FLORDA COn 55551!55 <br /> �\ THE ANTENNA CABLE INSTALLER SHALL BE RESPONSIBLE FOR PERFORMING ....wmwmm�neMnetl.mm <br /> ROUTE ANY NEW COAX OR \L.L.OF EXISTING METRO PCS ANTENNA AND SUPPLYING SPRINT WITH 3 TYPEWRITTEN SWEEP TESTS (ANTENNA <br /> CABLE UNDER BALCONY IN ELEV. 3126'-0"AGL RETURN LOSS TEST).THIS TEST SHALL BE PERFORMED TO THE <br /> BRACKETS SPECIFICATIONS AND PARAMETERS OUTLINED BY THE SPRINT RADIO <br /> C.L.OF EXISTING ANTENNA FREQUENCY(RF)ENGINEER.THIS TEST SHALL BE PERFORMED PRIOR <br /> ELEV. SITE NAME: <br /> UNKNOWN TO FINAL ACCEPTANCE OF THE SITE/ GIFFORD WATER TANK <br /> THE ANTENNA FIBER OPTIC CABLE INSTALLER SMALL BE RESPONSIBLE FOR <br /> L.L.OF EXISTING SPRINT IDEN ANTENNAS PERFORMING AND SUPPLYING SPRINT WITH }TYPEWRITTEN TIME DOMAIN <br /> ELEV. 3100'-0'AGL REFLECTOMETER(TDR)TESTS TO VERIFY CABLE LENGTH AND TO CHECK SITE NUMBER: <br /> FOR WATER DAMAGE. M160XC240 <br /> VAPOR WRAP WILL BE USED TO SEAL ALL CONNECTIONS. <br /> ALL JUMPERS TO THE ANTENNAS FROM THE MAIN TRANSMISSION LINE WILL <br /> BE 1/2"JUMPERS AND SHALL NOT EXCEED 6'-0'. MAXIMUM LENGTH SITE ADDRESS: <br /> FOR THE JUMPERS AT WIMAX BTS UNITS WILL BE 6'-0". 4690 28TH CT. <br /> UPON COMPLETION,PROVIDE A HEIGHT VERIFICATION DEPICTING RAD <br /> EXISTING 156'-8" CENTER AND TOP OF ANTENNA. VERO BEACH,FLORIDA 32948 <br /> WATER TANK TOWER IAN RIVER COUNTY <br /> ANTENNA MOUNTING NOTES <br /> DESIGN AND CONSTRUCTION OF ANTENNA SUPPORTS SHALL CONFORM TO M <br /> CURRENT ANSI/EIA/TA-222;APPENDIX B FOR WIND LOADING; <br /> "STRUCTURAL STANDARDS FOR STEEL ANTENNA TOWERS AND ANTEN ` 1LO1nJ <br /> ROUTE NEW COAX LINES OR SUPPORTING STRUCTURES"OR APPLICABLE LOCAL CODES. /� Y `Y TTISIIInINnz Y'' <br /> ALL STEEL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION <br /> CABLE ON/IN EXISTING ACCORDANCE WITH ASTM A72}"ZINC(MOT-GIPPED GALVANIZED <br /> MESSENGER PIPE SYSTEM COATINGS ON IRON AND STEEL PRODUCTS'.UNLESS OTHERWISE NOTED, ��N`y P`• "� NC <br /> ALL BOLTS,ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE e.� C,E ArS�^, <br /> NOTE: RRU'S ARE TO BE GALVANIZED IN ACCORDANCE WITH ASTM A153"ZINC-COATING(HOT NO. 62209 <br /> POWERED UP WITHIN 24 DIP)ON IRON AND STEEL HARDWARE".UNLESS OTHERWISE NOTED. <br /> HOURS OF PLACEMENT ON DAMAGED GALVANIZED SURFACES SHALL BE REPAIRED BY COLD - <br /> THE TOWER. GALVANIZING IN ACCORDANCE WITH ASTM A780. - <br /> DO NOT OPEN RRU ALL ANTENNA MOUNTS SHALL BE INSTALLED WITH DOUBLE NUTS AND •e STATE OF <br /> PACKAGES IN THE RAIN SHALL BE INSTALLED SNUG TIGHT. p e X• (� <br /> MINIMUM HORIZONTAL SPACING SHALL BE 2'-0'BETWEEN ALL ANTENNAS. .e OR I OPS '`` <br /> NOTES. V�; <br /> ALL AZIMUTHS ARE TO BE ESTABLISHED CLOCKWISE FROM THE TRUE <br /> NORTH HEADING. <br /> CONTRACTOR SMALL VERIFY PROPOSED ANTENNA RAD CENTER AND <br /> ORIENTATIONS WITH SPRINT PCS PRIOR TO INSTALLATION OF ANTENNAS. AH wANc <br /> PRIOR TO ATTACHING ANTENNAS AND MOUNTING SECTIONS,EXISTING REGISTERED EI1cNEER <br /> TOWER AND TOWER FOUNDATION MUST BE ANALYZED BY A LICENSED srATE OF FLDRwA <br /> STRUCTURAL ENGINEER TO VERIFY TOWER IS CAPABLE OF SUPPORTING FEwzzw <br /> NOTE: NOTE: THE PROPOSED LOADS. REFER TO STRUCTURAL ANALYSIS BY OTHERS, <br /> NEW SPRINT HYBRID CABLES TO RUN 1. STRUCTURAL CALCULATIONS FOR THE TOWER&SPRINT'S ANTENNA SUPPORTING MOUNTS IS CERTIFIED CONTRACTOR SHALL REFER TO TOWER STRUCTURAL CALCULATIONS <br />FOR <br /> ALONGSIDE EXISTING SPRINT CABLES. &PREPARED BY OTHERS AND THOSE CALCULATIONS CERTIFY THE CAPACITY OF THE TOWER STRUCTURE& ADDITIONAL LOADS. NO ERECTION OR MODIFICATION <br />OF TOWER SHALL <br /> CONTRACTOR TO TAKE EXISTING CABLES SPRINT'S ANTENNA SUPPORTING MOUNTS FOR THE DEPLOYMENT OF THE SPRINT NETWORK VISION BE MADE WITHOUT APPROVAL OF STRUCTURAL ENGINEER. <br /> TO BE REMOVED IN FINAL CONFIGURATION EQUIPMENT.CONTRACTOR TO COORDINATE WITH ERICSSON PROJECT MANAGER TO OBTAIN A COPY. <br /> OFF THEIR SUPPORTS(SNAP-INS)THEN BUNDLE DRAWN BY:WJ DATE DRAWN:05/12/12 <br /> THEM WITH ZIP TIES DURING THE INTERIM 2. CONTRACTOR TO REFER TO STRUCTURAL CALCULATIONS OF THE TOWER&SPRINT'S ANTENNA REVIEWED BY: CC APPROVED BY: I RL <br /> CONFIGURATION. NEW HYBRID CABLES TO BE SUPPORTING MOUNTS FOR ADDITIONAL MODIFICATIONS IF ANY. NO ADDITIONAL LOADS SHALL BE IMPOSED APPROXIMATE CABLE RUN <br /> INSTALLED WHERE EXISTING CABLES TO BE ON STRUCTURE&NO ADDITIONAL ERECTION OR MODIFICATION OF THE STRUCTURE SHALL BE MADE MH PROJECT#:17123001.00 <br /> REMOVED WERE.To <br /> IN FIELD. WITHOUT CONSENT&APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD.' SECTOR A SECTOR B SECTOR C REVISION <br /> NOTIFY ERICSSON CM OF ANY DISCREPANCY. NO DESCRIPTION BY DATE <br /> 3. NO WORK SHALL COMMENCE WITHOUT THE APPROVED TOWER/ANTENNA MOUNT STRUCTURAL ANALYSIS TOTAL 253'-6" 300'-0" 253'-6" <br /> REPORT SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEERINEERUNDER A 90%CO SUBMITTAL WJ 05NDER SEPARATE COVER.IF 05/14/12 <br /> REQUIRED,THE CONTRACTOR SHALL MODIFY TOWER AND/OR ANTENNA MOUNTS AS INDICATED IN THE ABOVE FROM RRU TO 0 FINAL HU 07/25/12 <br /> MENTIONED STRUCTURAL REPORT OR ASSOCIATED MODIFICATION DESIGN DRAWINGS. VERTICAL RUN 50' 97' 50' 7 FINAL WJ 09/27 12 <br /> CO <br /> MRACTOR TO COORDINATE WITH PROJECT MANAGER TO OBTAIN A COPY. RAD TO2 U.S.G.COMMENTS CA 06/12/13 <br /> 4. CONTRACTOR TO VERIFY CONDITION OF&TORQUE DOWN ALL CONNECTIONS OF EXISTING MOUNT PRIOR TOWER BASE 133'-6" 133'-6" 133'-6" <br /> TO PLACEMENT OF NEW LOADS. <br /> TOWER BASE <br /> TO RBS 70' 70' 70' <br /> SHEET TITLE: <br /> TOWER PROFILE <br /> TOWER PROFILE CABLE RUN TABLE SHEET NUMBER: <br /> SCALE: 1/16' 1'-0"(BASED ON 22x54 PAPER SIZE) 2 N.T.S. A�4 <br /> SCALE: 1/32"= 1'-0'(BASED ON 1117 PAPER SIZE) <br /> scar::VIc-r-4' <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.