My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
11/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:52:59 AM
Creation date
3/23/2016 9:05:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2013
Meeting Body
Board of County Commissioners
Book and Page
215
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NU.tif
SmeadsoftID
14235
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z INDIAN RIVER COUNTY <br /> Department of Utilitv Services <br /> OR <br /> Memo <br /> To: Jennifer Hyde,Manager,Purchasing Division <br /> From: Gordon E. Sparks,P.E.,Environmental Engineer 4!25 <br /> Thru: Arjuna Weragoda,P.E.,Capital Projects Manager Aw <br /> CC: Vincent Burke,P.E.,Utilities Director® <br /> Date: October 30,2013 <br /> Re: Bid Award Recommendation for Bid No.2014008 <br /> US Highway 1 Widening Utility Conflicts from Oslo Rd. to County Line <br /> WIP Number 47123536-044699-13502,UCP#4096 <br /> On Wednesday, October 16, 2013, five (5) Bids were received and opened at 2:00 PM for the above <br /> �..- referenced project as follows: <br /> Bidders Total Bid Price <br /> Young's Communication Co.,Inc.,(PCOM) $892,365.10 <br /> Johnson-Davis $1,061,087.50 <br /> Melvin Bush Construction,Inc. $1,137,374.04 <br /> Felix Associates of Florida,Inc. $1,172,658.85 <br /> Fountain Engineering Inc. $1,501,918.89 <br /> A detailed Bid Tabulation was prepared by Schulke, Bittle & Stoddard, L.L.C. (Schukle), the County's <br /> consultant for the project. The apparent low bidder is YCOM of Melbourne, FL. Schulke conducted an <br /> extensive reference check of YCOM's submittals, which included General Contractors, Consulting <br /> Engineers,Cities and a County. All were very positive in regards to YCOM's ability,staff and work ethics. <br /> In this light,they appear very capable to construct the US 1 utility confect improvements. <br /> The Engineer's Cost Estimate for construction was $1,100,000.00. Thus the low bid of$892,365.10 from <br /> YCOM was$207,634.90 less than anticipated.Therefore,staff of the Utilities Department recommend that <br /> the bid be awarded to the lowest responsive, responsible bidder, YCOM, for $892,365.10, A sample <br /> contract (two copies) has been prepared and is attached to this memo for pre-approval (in form) by the <br /> BCC in awarding the project. <br /> w.. <br /> Page I <br /> F:\Utilities\UTILITY-ENGINEERING\Pmjects-Utility Construction Permits\IRC-US 1 South from I Ith Street to County Line UCP 44096\Conflict <br /> Resolutions\OA-BID RECOMMENDATION Memo to PURCHASING October 30,2013 cmc.doc <br /> 91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.