My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/10/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
12/10/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 11:05:31 AM
Creation date
3/23/2016 9:06:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/10/2013
Meeting Body
Board of County Commissioners
Book and Page
216
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NX.tif
SmeadsoftID
14238
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORRELLI + PARTNERS <br />-C-TECTUAE -I.A-ING L-NDII-E <br />October 15th, 2013 <br />Mr. Christopher J. Kafer, Jr., P.E. <br />County Engineer <br />Engineering Division <br />1801 271h Street (Building A) <br />Vero Beach, FL 32960 <br />Re: Fee Proposal for Additional Surveying Services for the Indian River County Intergenerational Recreation Facility at <br />South County Regional Park Vero Beach, Florida <br />Dear Mr. Kafer-- <br />Borrelli, + Partners, Inc. .(B.+P) respectfully. submit this. scope and additional services fee proposal for the above referenced <br />project for your review and consideration. <br />The additional surveying services w I e are requestim- are as follows: <br />As part Of the preliminary, Aormwatercesign for the IRCintergenerational Recre <br />tion Center, Steve Moler and John Boyer, <br />our Civil Engineers determined that existing, ,4fili.ties'and ,stdrmw4ta facilities make. connecting to the drainage canal (our <br />site's legal outfall) along the south side of0slo Road I unfeasible. Our project will need to outfall to an existing stormwater <br />pond on the County -owned site to the east of,the .South County Park site. <br />In order to support the design of a stormwater pipe to connect to the existing pond (Pond 100 - see aerial in attached <br />proposal) we will need additional topography of the adjacent site. <br />The specific scope of services are as follows- <br />I- Recover existing horizontal and vertical control. Elevations shall be basedupon NAVD'88. <br />2. Obtain elevations on 50 foot grid Within, the project UrnIM. <br />3. Locate and obtain elevation$, on all visible improvements, including pavement, utilities, fences. etc. <br />4. Locate and obtain elevations of existing retention, pond, including top of bank and toe slope. <br />5. locate and identify all trees,4' or larger., as required by County code. <br />6. Integrate with existing topogn(phic-sorvey and prepare, updated topo <br />graphi i c survey as necessary. <br />7- Upon completion, provide ten 00) signed and sealed copies and one digital file of the survey. <br />NOTINCLUDED IN SCOPE OF SERVICES.. - <br />The following services are not included Within our scope of services and: fee proposal: <br />A. Geotechnical Engineering services: <br />B. Environmental Consulting Services. <br />C. Traffic Engineering/ Studles.. <br />D. Food Servike Consuitant, <br />E; Audio VIWOVS-gcurtty/CoMrhunications Equipment, Design [design incl, conduit onlyl, <br />F, LEED SerVices I Commissioning, <br />G. Interior Design Services [incl. material selection boards, interior renderings, FF&E]. <br />H. Public Pr6entabons (other than noted herein), <br />1. Models or Renderirig5 (other than >noted herein). <br />J. Permit Review Fees. <br />JAIME F- BGkRELLI, AIA, NCARE3 :: JORGE A- UORRELLI, ASLA :, JIM BORRELI-1, CGC :,. JUDY A. CARTY, AIA, NCARS <br />h.l. 407-'141K 1 AM :: fits 417.418:1342 <br />72t1 VaisayStreet, 0danJo. rlorhfa 32,M) I <br />AAC 06P-14 I <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.