My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/12/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
02/12/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 12:54:57 PM
Creation date
3/23/2016 8:55:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/12/2013
Meeting Body
Board of County Commissioners
Book and Page
138
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MX.tif
SmeadsoftID
14203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6 Incumbent, or Incumbent's Agent, shall send all invoices with the Invoice Number and <br /> corresponding Purchase Order Number clearly marked on the invoice. <br /> 4. Removal Disposal and Replacement of Existing Equipment. <br /> 4.1. AT&T MOBILITY shall have no responsibility with regard to the removal and/or <br /> disposal of equipment utilized in connection with the Licensed Frequencies or with <br /> regard to any aspect of any Replacement System that Incumbent may install. <br /> Incumbent shall, at its sole expense, be responsible for purchasing or procuring all <br /> equipment and services necessary or appropriate in connection with the removal of its <br /> facilities used in connection with its Microwave Operations and the construction, if any, <br /> of substitute facilities, and assumes any and all liability thereof as the owner/operator of <br /> such Replacement System. <br /> 4.2. AT&T MOBILITY shall have no responsibility for the removal of any hazardous or <br /> toxic materials or the special treatment of any environmentally sensitive facilities <br /> resulting from the Decommissioning of the Licensed Frequencies and the installation of <br /> the Replacement System, and Incumbent shall be solely responsible for the management <br /> and costs associated therewith. <br /> 5. Incumbent Performance. Incumbent shall take, or cause to be taken, all of the necessary and <br /> proper acts to Decommission the Licensed Frequencies on or before the Decommissioning Date, <br /> including, without limitation, the following: <br /> 5.1 Obtain or secure all necessary governmental and third party permits, authorizations, <br /> inspections, licenses and consents, including frequency coordination, if necessary. <br /> 5.2 Oversee, coordinate and manage the relocation process and construction, if necessary, <br /> of a Replacement System, including engaging and paying all agents, contractors or <br /> subcontractors. <br /> 5.3 Manage the termination of power on the 2.1 GHz equipment utilized in the Microwave <br /> Operations on the Paths. <br /> 5.4 Provide all necessary technical and engineering support for the Microwave Operations <br /> or Replacement System. <br /> 5.5 Remove and/or dispose of equipment utilized in Incumbent's existing Microwave <br /> Operations or with regard to any aspect of any Replacement System that Incumbent <br /> may install. <br /> 5.6 Electronically file utilizing the ULS the 601(s) canceling Incumbent's authorization(s) <br /> to conduct Microwave Operations on the Paths identified in the attached Exhibit A. <br /> 5.7 At least 10 days prior to the Decommissioning Date, Incumbent shall notify AT&T <br /> ZD <br /> MOBILITY in writing that it expects to satisfy its Decommissioning obligations by the <br /> Decommissioning Date. If Incumbent fails to provide such notice, AT&T MOBILITY <br /> 4` shall have the right to inquire of Incumbent as to the status of the Decommissioning of <br /> 4 <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.