Laserfiche WebLink
PUBLIC <br /> INDIAN RIVER COUNTY, FLORIDA HEARINGS <br /> MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director CW11 <br /> AND <br /> Christopher J. Kafer,Jr., P.E., County Engine <br /> /;V <br /> FROM: Michael D. Nixon, P.E., Roadway Production Manager /V <br /> SUBJECT: PUBLIC HEARING and CONFIRMING RESOLUTION for 7th Place Petition Millings Project <br /> from 63`d Avenue to 60th Avenue in the Pine Tree Park Subdivision <br /> IRC Project No. 1212 <br /> DATE: January 18, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> Representatives in Pine Tree Park Subdivision presented County staff with a petition to install <br /> asphalt millings on 7th Place between 63rd Avenue and 60th Avenue.The project consists of 52 <br /> parcels, with 33 in favor of the project. The parcels vary in size. Based on square footage, <br /> 75.6%were in favor of the project. The minimum per the IRC code is 66.7%. Therefore this <br /> project meets the requirements for petition paving (millings). <br /> On January 8, 2013 the Board of County Commissioners adopted Resolution No. 2013-02 <br /> providing for certain paving(millings)to 7th Place Petition Millings Project from 63`d Avenue to <br /> 60th Avenue in the Pine Tree Park Subdivision. Also on January 8, 2013, the Board of County <br /> Commissioners adopted Resolution No. 2013-03 setting the date and time for a Public Hearing <br /> to discuss the process to be taken, costs and amount of the assessment against each property <br /> owner. The Public Hearing was scheduled for February 12, 2013. <br /> The proposed improvements to 7th Place will consist of the installation of 8-inch thick <br /> compacted asphalt millings over 9-inches of stabilized sub-grade. The roadway limits will be <br /> one block west of 63'd Avenue to 60th Avenue. The adjoining side streets mid-block north and <br /> south of 7th Place will be included in the roadway improvements. <br /> Two public informational meetings were held by County staff with the petitioners to discuss the <br /> project scope and assessment process. The meetings were held on October 24, 2012 and <br /> December 5, 2012. At the resident's request,the millings will be placed in the same area as the <br /> existing dirt roadway and no roadway widening,shoulder work or drainage will be included as <br /> part of the project. At the second meeting, the property owners consented to moving the <br /> project forward. <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1212-7th Place-60th Ave to 63rd Ave-Petition Paving\.Admim\agenda items\1212_-7th Place-Pet.mill PUB HEARING&RES.3 84 <br /> -12_lid�n dnc <br />