Laserfiche WebLink
2/19/2013 <br /> Oslo Road 4-laning between 58th Avenue and 43rd Avenue <br /> Timothy Rose Contracting, Inc. <br /> Project = 40% done, to be completed in late 2013 <br /> $3.8 million <br /> NPfkr, <br /> 'a <br /> 7 , <br /> :rig ynn*.: <br /> ROADS <br /> 66th Avenue(4th Street to 16th Street)paving <br /> 66th Avenue(SR60 to 49th Street)4-laning <br /> Oslo Road(581h Ave to 43rd Ave)4-laning <br /> Oslo Road(82nd Ave to 74th Ave)resurfacing <br /> 27th Avenue(Oslo Rd to SR60)resurfacing <br /> Indian River Boulevard(41St Street to 53'd Street)resurfacing <br /> 53rd Street(US1 to IRBlvd)signalization @ 24th Avenue/new Publix <br /> Pine Tree Park Subdivision paving <br /> Vero Lake Estates Subdivision paving <br /> CR512 Eastbound(Roseland Road to Easy Street)resurfacing <br /> FDOT projects <br /> •1-95 between SR70 and SR60 <br /> -SR60 between 66th Avenue and 58th Avenue <br /> •USI between Oslo Road and SR713/Turnpike Feeder Road <br /> SIDEWALKS <br /> Old Dixie(8th Street to SR60)new sidewalk <br /> M-7 <br />