My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
02/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 12:56:02 PM
Creation date
3/23/2016 8:55:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/19/2013
Meeting Body
Board of County Commissioners
Book and Page
470
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MZ.tif
SmeadsoftID
14204
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No.: 12-276 <br /> Tract No.: FLBQQ-INDI-001 <br /> EXHIBIT "A" <br /> Attached to and made a part of that certain <br /> ENCROACHMENT AGREEMENT <br /> Dated , 2013 <br /> By and between <br /> FLORIDA GAS TRANSMISSION COMPANY, LLC <br /> And INDIAN RIVER COUNTY <br /> ENGINEERING AND CONSTRUCTION SPECIFICATIONS <br /> 1. No work can be done in FGT's easement property unless FGT has reviewed and approved the <br /> plans and an Agreement in writing has been entered into between the parties. <br /> 2. IRC shall provide a minimum of forty-eight (48) hours' notice to FGT prior to any installation, <br /> construction, excavation, or demolition work on the easement area. To ensure further safety, IRC must <br /> call appropriate ONE CALL for a locate at 1-800-432-4770. An FGT representative must be present <br /> when any work is done on the easement area. The onsite FGT representative will have the authority to <br /> shutdown work by the contractor if the contractor's activities are judged to be unsafe by the FGT <br /> representative. The FGT representative will be invited to participate in contractor's safety meetings. This <br /> provision applies each time FGT's pipeline facilities are crossed. <br /> 3. Existing ground elevation (a minimum of three feet [3'] of pipeline cover) is to be maintained <br /> over the subsurface pipeline facilities within the easement area. Three feet (3') of minimum cover will <br /> also be required over the pipeline facilities at all equipment crossings for standard FDOT maximum axle <br /> load vehicles (20,000 lbs.per axle; 80,000 tbs.maximum weight).. <br /> 4. For vehicles and/or construction equipment exceeding the standard FDOT wheel axle load limits <br /> and requesting approval to cross FGT's facilities, each crossing location will be reviewed on a case-by- <br /> case, site-specific basis and will require the surveyed elevation of the pipeline and/or facility verified by <br /> an FGT field representative to be performed by the party requesting the crossing encroachment and <br /> submitted to FGT. The execution of a wheel load calculation must be completed and approved by FGT <br /> prior to crossing FGT's facilities for every vehicle and/or construction equipment requesting to cross. <br /> FGT may require matting or other suitable material be installed to achieve the necessary support for such <br /> crossing. This too will be site specific and case-by-case only. <br /> 5. Where consent for roadway crossings has been granted, a minimum of forty-eight inches (48") of <br /> cover, including thirty-six (36") of undisturbed or compacted soil, shall be maintained within the <br /> easement area. All roads must cross the easement at a ninety degree(90') angle. <br /> 6. When crossing an FGT pipeline (via drill or open lay) Contractor must visually verify the <br /> elevation of pipeline both vertically and horizontally, by means of various methods such as SUE <br /> (subsurface utility excavation) etc., with an FGT field representative on-site at all times during this <br /> operation. When using direction drill method, a minimum vertical clearance of ten feet (10') from the <br /> pipeline is required. <br /> 7. Where the encroachment includes utilities, all such utilities crossing the easement area must have <br /> a minimum separation of twenty-four inches(24")between the utility and the FGT pipeline(s)at the point <br /> of crossing and must cross at a ninety degree (90') angle. No utilities shall be constructed between the <br /> surface of the easement area and the top of the subsurface pipeline facilities unless agreed to in writing by <br /> FGT. No parallel utilities, structures, and/or appurtenances are permitted within the easement area. All <br /> proposed aerial crossings will be reviewed on a case-by-case basis. <br /> 8. Where consent for utility lines has been granted, electric lines must be encased in pvc or steel <br /> throughout the entire easement area. All fiber optic,telephone and cable television crossing encasements <br /> to be determined by the on-site FGT field representative. Cables energized to 600 volts or more must <br /> cross a minimum of three feet (3') below the subsurface pipeline facilities, and also be encased in <br /> concrete, color coded red, across the entire right-of-way width, and have external, spiral wound, neutrals <br /> grounded on each side of the right-of-way. The cable crossing should be clearly and permanently marked <br /> on each side of the right-of-way where permissible. <br /> 9. Where consent for fencing has been granted, the IRC must install and maintain a vehicle access <br /> gate at least twelve feet (12') in width at each point in the fence line(s) crossing the Easement area. <br /> Posthole excavations for fencing placed on the easement area shall not be greater than eighteen inches <br /> (18") below the ground surface elevation. No fence posts shall be placed over the pipeline facilities or <br /> closer than six feet(6') on either side of the pipeline facilities. Any exceptions will be determined by an <br /> FGT field representative. Any such fence shall be constructed and maintained by IRC in such a manner <br /> r.,, that does not prevent FGT personnel from viewing the easement area from the ground level through the <br /> fence(s) (i.e. no solid fences allowed). No fencing parallel to the FGT pipeline facilities will be allowed <br /> -5- <br /> 185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.