My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
02/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 12:56:02 PM
Creation date
3/23/2016 8:55:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/19/2013
Meeting Body
Board of County Commissioners
Book and Page
470
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004MZ.tif
SmeadsoftID
14204
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ardaman & Associaf <br /> Geotechnical, Environmenta <br /> fi li..lam...:.-.I-. !'�...........Ii�....i.. <br /> EXHIBIT "A" <br /> ARDAMAN &ASSOCIATES, INC. <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> (March 3, 2013 through March 2, 2014) <br /> CONCRETE SAMPLING AND TESTING <br /> Cylinder samples(up to 4 cylinders per set):molding <br /> curing, and strength testing(ASTM C-31 and C-39). <br /> Cylinders shall be left in a place provided by the <br /> Contractor,covered with plastic caps and attempts <br /> made to provide shade thereon.If temperature of <br /> the air is critical to first 24 hours(during field curing), <br /> equipmentto maintain such controls shall be provided <br /> by others. $80.00/set <br /> Additional cylinders $15.00/cylinder <br /> Technician time due to construction delays and time <br /> transporting cylinders from site to office <br /> if no other work is required $44.00/hour <br /> Curing and strength testing samples delivered to our <br /> laboratory(ASTM C-39) $15.00/cylinder <br /> Continuous monitoring of concrete placement and/or <br /> extra slump and temperature tests,technician time $44.00/hour <br /> Slump tests(ASTM C-143) $15.00/test <br /> Air Entrainment(ASTM C-173) $30.00/test <br /> Unit weight $35.00/test <br /> Yield tests $35.00/test <br /> Verification of mix design $225.00/each <br /> Fineness modules $44.00/each <br /> Plant control $65.00/hour <br /> Concrete blocks.Strength tests(determined by gross area) $30.00/block <br /> Concrete blocks.Absorption and strength tests(net area) $125.00/set of 3 <br /> Block Prism Assembly $220.00/set of 3 <br /> Flexural Strength Beams(up to 3 beams)$30.00 each additional beam $150.00/set of 3 <br /> Test beams made by others $50.00/each <br /> Grout Prisms 3/set(blocks supplied by others) $80.00/set <br /> Marsh Funnel Viscosity $35.00/test <br /> SAMPLING AND TESTING OF IN-PLACE CONCRETE/SOIL CEMENT <br /> Coring and testing of cored samDles: <br /> Technician time(two technicians may be required) $44.00/hour <br /> Mobilization of coring equipment <br /> With power supplied $125.00/trip <br /> Without power supplied $100.00/trip <br /> Trimming,capping and strength test(ASTM C-42) $30.00/core <br /> Depth measurement $15.00/core <br /> Swiss Hammer <br /> Mobilization of equipment $50.00/trip <br /> Technician time $52.00/hour <br /> 460 NW Concourse Place,Unit 1 Port St.Lucie,Florida 34986 772-878-0072(office) 772-878-0097(fax) Page 2 of 8 <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.