My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/21/1991
CBCC
>
Meetings
>
1990's
>
1991
>
5/21/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:21:55 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/21/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"As per Section 910.07 of the County's Land Development Regulations, <br />:conditional concurrency review examines the available capacity.of <br />.;.each facility -with respect to a proposed project. Since <br />comprehensive plan- amendments and non -PD (Planned Development) <br />*rezoning requests are not projects, county regulations call for the <br />concurrency review to be based upon the most intensive use of the <br />subject property based upon the requested zoning district or land <br />use designation. For commercial comprehensive plan amendment <br />.requests, the most intensive use (according to the county's LDR's) <br />is retail commercial with 10,000 square feet of gross floor area <br />per acre of land proposed for redesignation. Since the subject <br />comprehensive plan amendment request is -for a commercial land use <br />designation, the 10,000 square feet of floor area per acre of land <br />proposed for redesignation with a retail commercial usage is used <br />as the basis for the concurrency determination of the proposed <br />request. <br />-Transportation <br />A review of the traffic impacts that would result from the proposed <br />development of the property indicates that the existing level of <br />service "D" or better would not be lowered. The maximum buildout <br />permitted by the existing zoning is 48 units; that amount of <br />development would generate approximately 293 average daily trips. <br />A retail commercial use of 80,000 square feet on the subject site <br />would generate approximately 7,577 daily trips, based on the <br />Institute of Transportation* Engineers (ITE) trip generation rates. <br />Of these trips, only 49% or 3,716 TEPD (Trip Ends Per Day), will be <br />new trips. The actual number of trips would depend on the total <br />square footage and the exact mix of uses. The traffic capacity for <br />this segment of U.S. #1 is 2,370 trips (peak hour/peak season/peak <br />direction) at a Level of Service "D". The existing traffic volume <br />on this segment of U.S. #1 is 975 trips (peak hour/peak season/peak <br />direction): The additional 3,716 Trip Ends Per Day created by the <br />proposed comprehensive plan amendment will increase the total peak <br />hour/peak season/peak direction trips for this segment of U.S. #1 <br />by approximately 305 peak hour/peak season/peak direction trips. <br />Roseland Road has a capacity at a level of service "C" of <br />approximately 700 peak hour/peak season/peak direction trips in the <br />vicinity of, the project. This segment of Roseland Road has an <br />existing traffic volume of 380 peak hour/peak season/peak direction <br />trips. The proposed development will result in an increase of <br />approximately 84 new peak hour/peak season/peak direction trips on <br />Roseland Road. Based on staff analysis, it was determined that <br />U.S. #1 and. Roseland Road can accommodate the additional trips <br />without decreasing their existing levels of service. A more <br />detailed review of transportation impacts will *be required as part <br />of any future site development application review. <br />- Water <br />A retail commercial use of 80,000 square feet on the subject <br />property will have a water consumption rate of 16.5 Equivalent <br />Residential Units (ERUs), or 4,125 gallons per day. County water <br />is not currently available for the site; however, the existing <br />Riverwalk Shopping Center utilizes an on-site water treatment plant <br />which has a design capacity of 60,000 gallons per day and a <br />remaining capacity of over 30,000 gallons per day to serve the <br />subject property. Prior to final consideration by the Board of <br />County Commissioners, the applicant must enter into a developer's <br />:.agreement which states that the applicant agrees to connect to the <br />county water system when the service becomes available. With the <br />execution of the developer's agreement,, the potable water <br />concurrency test will be satisfied for the subject request. <br />`Wastewater <br />,Wastewater service is available to the subject property from the <br />North County Wastewater Plant. Based upon the site development <br />%parameters referenced above, wastewater generation for the site <br />,.after development consistent with the proposed amendment will be <br />;approximately 16.5 Equivalent Residential Units (ERUs),. or 4,125 <br />gallons per day. The North County Plant currently has .a remaining <br />capacity of approximately 1.9 million gallons per day and can <br />accommodate the additional wastewater generated by the proposed <br />.amendment. The applicant has paid the necessary impact fees for <br />wastewater service for the subject property and will connect to the <br />North County Plant at the time of development. This is consistent <br />with Future Land Use Policy 2.7 which requires development projects <br />to maintain established levels of service. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.