My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 to WORK ORDER NO. 5-RR AMENDMENT No. 2 <br /> �-- PROFESSIONAL ENGINEERING SERVICES for ADDITIONAL <br /> PERMITTING REQUIREMENTS for the <br /> ROCKRIDGE SUBDIVISION SURGE PROTECTION PROJECT <br /> INTRODUCTION/O VER VI EW <br /> Indian River County (the "County") has requested that Malcolm Pirnie, Inc. (the <br /> "CONSULTANT") perform additional environmental permitting services in order to <br /> secure a permit from the US Army Corps of Engineers (USACE). The additional <br /> USACE environmental permitting services — above the services approved by <br /> Amendment No. 1 of Work Order Number 5-RR - are required because the <br /> environmental mitigation permitting issues associated with using the County owned <br /> property (Earman Island) for this project are compounded because an adjacent piece of <br /> property on the Island is also being permitted for another County mitigation project <br /> (Oslo Boat Ramp). The CONSULTANT has to address the USACE request to <br /> coordinate the Earman Island mitigation plan with the Oslo Boat Ramp mitigation project <br /> and for additional information required in securing a permit for this adjacent mitigation <br /> site. The recent request by the USACE requires Work Order No. 5-RR, Amendment <br /> No. 2 to be issued for the associated additional engineering services related specifically <br /> to the activities for the proposed mitigation site. <br /> 1.0 ADDITIONAL ENVIRONMENTAL PERMITTING SERVICES <br /> Provide additional environmental permitting services as necessary to permit the <br /> Rockridge Surge Protection Project with the US Army Corps of Engineers, including but <br /> not limited to site visit, preparation of mitigation plan, and written and oral <br /> communication with the USACE and the County. The activities to address the <br /> requirements of the USACE will require additional manhours by the CONSULTANT to <br /> acquire the USACE permit necessary for this project <br /> **END OF ATTACHMENT 1** <br /> 2 <br /> C:\Users\rawlingspWppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\LTFDOVU8\Work Order#5-RR <br /> Amendment 2.doc <br /> 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.