My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/19/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
03/19/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:15:40 PM
Creation date
3/23/2016 8:56:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/19/2013
Meeting Body
Board of County Commissioners
Book and Page
311
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N2.tif
SmeadsoftID
14207
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g� <br /> INDIAN RIVER COUNTY, FLORIDA <br /> BOARD MEMORANDUM <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director <br /> Christopher J. Kafer, Jr., P.E., County Engine <br /> Michael D. Nixon, P.E., Roadway Production M nagger <br /> FROM: Arjuna Weragoda, P.E., Project Engineer <br /> SUBJECT: Civil Engineering and Land Surveying Agreement for <br /> CR 510 between 61St Drive and Shore Lane- Amendment No.5 <br /> IRC Project No. 0549 <br /> DATE: March 5, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> McMahon and Associates, Inc. is under contract with Indian River County to provide Civil <br /> Engineering and Land Surveying Services for CR 510 between 61 st Drive and Shore Lane. On <br /> December 18, 2012, the Board of County Commissioners voted to advance the CR 510 widening <br /> project in its 5-year Capital Improvement Element. To address this change, staff proposes the <br /> attached Amendment No. 5 which includes the following: <br /> • Shorten the segment of CR 510 to begin at 55th Avenue instead of 61 st Drive. This change <br /> will result in amended plan and profile sheets, cross-section sheets, tabulation sheets, <br /> signing and marking sheets, signalization sheets, drainage structures sheets,typical section <br /> sheets, landscape and irrigation plans and traffic control plan sheets <br /> • Move detention Pond No.7 to a mutually-agreeable location within the Graves Brothers <br /> property located on the north side of CR-510 between US1 and FEC Rail Road Tracks. This <br /> change will require additional surveying, geotechnical exploration and drainage analysis <br /> which will also result in revisions to the drainage report. <br /> • The construction plans and specifications for Indian River County Utilities will be updated to <br /> reflect the new project limits. <br /> Design drawings are 90% completed for the widening of CR-510 from 61 st Drive to Shore Lane, <br /> which includes the widening on US Hwy 1. The 100%design drawings for the revised limits will be <br /> submitted within six months from notice to proceed. During the development of the 100% <br /> construction plans, Indian River County staff and the consultant (McMahon and Associates, Inc.) <br /> will coordinate and share information on detention Pond No.7 with Graves Brothers. The <br /> contemplated design changes will need to be permitted by St. Johns River Water Management <br /> District, Florida Department of Transportation, US Army Corps of Engineers and the Florida East <br /> Coast Railway. <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0549-CR510 61 st DR to Indian Riv Lagoon Shore LA(McMahon)\Admim\Contracts\Contracts& <br /> Agenda Items\Agenda's\Amendment No.5 for 03-19-13 BCC.doc <br /> 172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.