"SECTION IV-TIME FOR COMPLETION"is being modified to incorporate the following: <br /> The time for completion of 100% design drawings, will be approximately six(6)months, and will include <br /> submittal for the project permit. All other associated work, including permit coordination and other associated work <br /> with the scope of services detailed in this amendment (Number 5) may extend up to twenty-four (24) additional <br /> months beyond the timeline established by and between the ENGINEER and the COUNTY, as agreed in previous <br /> Amendment Number 4. The adherence to this schedule is directly associated with, and impacted by the COUNTY <br /> to secure the project right-of-way, secure all utility agreements, as per FDOT requirements, and possible weather <br /> conditions, and/or gaining access to private property, and the FDOT permit process, which is out of the control of <br /> the ENGINEER and COUNTY, as it is related to internal departmental reviews of individual FDOT departments. <br /> Should these herein current supplemental project conditions be altered, the assumed time frame, as well as the <br /> supplemental fee effort, enumerated herein, to complete the 100% plans, will be effected, and will therefore, be <br /> addressed in a separate supplemental amendment, and will require approval by the,COUNTY. <br /> 180 <br />