Laserfiche WebLink
Task Fee Fee <br /> �.. Hourly Rate Components Amendment 5 Total Contract <br /> 41ane/2 lane Roadway Transition $ 0.00 $ 15,000.00 <br /> Geotechnical Investigation $ 0.00 $ 22,760.00 <br /> Retention Pond Design $ 0.00 $ 52,542.00 <br /> Phosphorus Mitigation $ 0.00 $ 1,020.00 <br /> Landscape Details/Maintenance $ 0.00 $ 6,000.00 <br /> Utility Location Survey $ 0.00 $ 12,000.00 <br /> Utility Soft-dig Location Survey $ 0.00 $ 37,350.00 <br /> (drainage design) (83 @$450) <br /> Utility Soft-dig Location Survey $ 0.00 $ 34,650.00(') <br /> (reuse/stub-outs)(77 @$450) <br /> MOT for Utility Soft-dig $ 0.00 $ 16,000.00 <br /> (8 set-ups @$2,000) <br /> MOT for Utility Soft-dig $ 0.00 $ 12;000.00(1) <br /> (6 set-ups @$2,000 ea) <br /> Special Signal Pole Design $ 0.00 $ 16,000.00 <br /> Parcel Sketches&Legal Descriptions $ 0.00 $ 79,500.00 <br /> Parcel Sketches&Legal Descriptions @$600 $ 0.00 $ 6,600.00 <br /> (original est. at 11 parcels) <br /> Parcel Staking(10 @$600.00) $ 0.00 $ 8,640.00 <br /> Cure Plans $ 0.00 $ 32,000.00 <br /> Pond/Property Site Surveys $ 0.00 $ 27,000.00 <br /> Miscellaneous Wetland Delineation $ 0.00 $ 0.00 <br /> Re-profiling Roadway due to Groundwater $ 0.00 $ 6,270.00 <br /> Project Coordination/Meetings/Admin. $ 15,000 .00 $ 15,000.00 <br /> Construction Phase Assistance $ 0.00 $ 20,000.00 <br /> Sub-total $ 15,000.00 $ 420,332.00 <br /> Grand Totals $1,443,551.00 <br /> (1) This fee is provided for separately,as funding source is the responsibility of the COUNTY Utility Department. <br /> When submitting invoices,this work effort will be indicated separately. <br /> 182 <br />