Laserfiche WebLink
Exhibit 1 <br /> List of potential Public Works, SWDD, Utilities-Major and Utilities-Minor project categories: <br /> • Capital Improvement Projects (CIP). <br /> • Operating and Maintenance Projects (O&M). <br /> • Miscellaneous General Plant-related and Landfill-related Engineering Services. <br /> • Budgetary and process/operating cost analysis projects. <br /> • Hydraulic & Sewer/Water Quality Modeling. <br /> • Permitting and Regulatory Assistance. <br /> • Grant Writing & Funding Analysis. <br /> • Subsurface Soils Exploration in Conjunction with Engineering Design Projects. <br /> • Surveying, Mapping, GIS and GPS Services in Conjunction with Engineering <br /> Design Projects. <br /> • Survey Construction Layout. <br /> • Sketch and Legal Descriptions. <br /> • Site Work including Stormwater Design. <br /> • Structural, Mechanical, Electrical and Instrumentation Services <br /> • Wastewater and RO Water Design and Distribution <br /> • Capital Estimates <br /> • Environmental Impact Assessments <br /> • Biological Survey <br /> • Archaeological Survey <br /> • S.?lid Waste Class 1 Landfill Design, Construction and Operation Permits, <br /> Closure Permits. <br /> • Solid Waste Groundwater Monitoring Permits, Contamination Assessments, <br /> Biennial Reports, Groundwater Contour Mapping, and Remedial Action Plans. <br /> • Solid Waste Stormwater Management Permits to include any Required Wetlands <br /> Studies or Mitigation Determinations. <br /> • Solid Waste Annual Financial Reports <br /> • Enhancement Projects (Sidewalks, Landscaping and Irrigation, etc.). <br /> • Roadway Design and Permitting. <br /> • Roadway Intersection Improvement Design and Permitting. <br /> • Traffic Signage and Pavement Marking Design. <br /> • Traffic Signal Design. <br /> • Maintenance of Traffic (MOT) Plans. <br /> • Stormwater Improvement Design and Stormwater Drainage Calculations. <br /> • And other Engineering Tasks as Directed by the Director of Utility Services, <br /> Director of Public Works and Director of Solid Waste. <br /> • Bridge Design. <br /> The work on the foregoing projects may occur at any time within the five (5) year rolling <br /> Capital Improvement Program, including but not limited to the following referenced list: <br /> 14 <br /> F:\Utilities\UTILITY-Engineering\Projects-Utility Construction Permits\IRC-Water and Wastewater Continuing Consultant <br /> Services UCP#2020\Continuing Contract 2011\Consultant Agreements\Geosyntech Contract Agreement.doc — <br /> 52 <br />