My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/05/2013 (3)
CBCC
>
Meetings
>
2010's
>
2013
>
03/05/2013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:19:35 PM
Creation date
3/23/2016 8:55:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/05/2013
Meeting Body
Board of County Commissioners
Book and Page
266
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N0.tif
SmeadsoftID
14205
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT <br /> Geosyntec (> 6770 South Washington Avenue,Suite 3 <br /> ',1} Titusville,Florida 32780 <br /> Cons tants PH 321.269.5880 <br /> FAX 321.269.5813 <br /> wwlv.aeosvntec com <br /> 1 February 2013 <br /> Mr. Mike Nixon <br /> Roadway Production Manager <br /> Engineering Division <br /> Indian River County <br /> 1801 27th Street(Bldg A) <br /> Vero Beach, FL 32960-3388 <br /> Subject: Professional Services Proposal <br /> Site Assessment Activities <br /> Former Cattle Dip Site <br /> 925593 rd Street on County Road 510 <br /> Parcel#31392600000002000001.0 <br /> Vero Beach, Florida <br /> Dear Mr.Nixon: <br /> Geosyntec Consultants(Geosyntec) is pleased to submit this fee proposal to Indian River County <br /> (IRC) for professional services associated with the completion of additional site assessment <br /> activities at the referenced Former Cattle Dip site. The site assessment activities are based on the <br /> Florida Department of Environmental Protection's (FDEP) Review of the Site Assessment <br /> Report Addendum No. 2, which recommended supplemental groundwater assessment activities <br /> to delineate the extent of the arsenic groundwater impacts with the submittal of a Site <br /> Assessment Status Report (SASR). The arsenic groundwater impacts must be delineated to the <br /> FDEP Groundwater Cleanup Target Level of 10 micrograms per liter (µg/L). The proposed <br /> scope of work for the services anticipated to delineate and monitor the arsenic groundwater <br /> impacts has been broken down into five separate tasks as described below. <br /> Task 1—Preliminary Activities <br /> Task 1 includes project management for the entire project, as well as all preliminary activities <br /> associated with securing project costs from subcontractors and updating the Site-Specific Health <br /> and Safety Plan to cover the additional assessment activities. Specific activities include: <br /> • updating the existing OSHA-required, Site-Specific Health and Safety Plan; <br /> • scheduling a utility locate, acquiring field equipment (pumps, water quality meters, <br /> calibration solutions, sampling containers, etc.), subcontracting; and <br /> w.. XR13013/CCR13002.DOC <br /> engineers I Scientists I iniaovatorS <br /> 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.