My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/06/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
04/06/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:21:18 PM
Creation date
3/23/2016 8:57:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/16/2013
Meeting Body
Board of County Commissioners
Book and Page
161
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N5.tif
SmeadsoftID
14210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY svER� <br /> 140- PUBLIC WORKS DEPARTMENT <br /> STORMWATER DIVISION _ <br /> 180127" STREET ,• <br /> VERO BEACH,FLORIDA 32960 <br /> Phone: (772)226-1562 <br /> ORiy <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Director <br /> FROM: W. Keith McCully, P.E., Stormwater Engineer 140 <br /> SUBJECT: CONSENT AGENDA -APPROVAL OF AMENDMENT NO. 3 TO WORK <br /> ORDER NO. 5-RR FOR THE ROCKRIDGE SUBDIVISION SURGE <br /> PROTECTION PROJECT <br /> DATE: April 4, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> The purpose of this agenda item is to request approval of Amendment No. 3 to Work <br /> Order No. 5-RR with the consulting engineering firm Malcolm Pirnie, Inc./Arcadis, for <br /> additional environmental mitigation permitting services for the U.S. Army Corps of <br /> Engineers (USAGE). The Rockridge Surge Protection Project includes mitigation of <br /> impacted wetlands. The proposed mitigation site is on County owned Earman Island <br /> and the additional permitting services are required because an abutting piece of the <br /> island is being used for proposed mitigation for another County project (Oslo Boat <br /> Ramp). Sometime after Malcolm Pirnie submitted the latest Rockridge mitigation site <br /> plan to the USACE, the adjacent Oslo Boat Ramp mitigation site plan was revised at the <br /> request of the USACE. Malcolm Pirnie must now revise its proposed Rockridge <br /> mitigation site plan to show the latest Oslo Boat Ramp mitigation site plan modifications, <br /> and resubmit it to the USACE. Thus, Amendment No. 3 is necessary to harmonize the <br /> activities of the two proposed mitigation sites for the USACE's review. <br /> Obtaining the USACE permit is necessary for this project in order to satisfy <br /> requirements of a FEMA Hazardous Mitigation Grant Program (HMGP) contract (Phase <br /> 1 subcontract). This contract was issued shortly after Hurricanes Jean and Francis <br /> devastated the County in 2004. The Rockridge subdivision experienced significant <br /> flooding during Hurricane Francis and the HMGP contract was issued in order to <br /> mitigate future flooding within the subdivision. This work effort is referred to as the <br /> f:Apublic workslkeithmistormwater projectsVockridge suboivision\agenda items\agenda item-mpi amendment no.3 to work order <br /> no.5-rr.doc <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.