My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/06/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
04/06/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:21:18 PM
Creation date
3/23/2016 8:57:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/16/2013
Meeting Body
Board of County Commissioners
Book and Page
161
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N5.tif
SmeadsoftID
14210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gifford Nei hborhood Plan Plan <br /> special projects. Besides conducting maintenance activities, the county will provide various infrastructure <br /> enhancements. This will include streetscape improvements and sidewalk enhancements. <br /> Obiective 6 Provision of Sidewalks and Streetscape Improvements <br /> By 2005, there will be continuous sidewalks along 41St Street from 58t" Avenue to U.S. #1; along 45th Street from 43rd Avenue to U.S. <br /> #1; and along 43rd Avenue between 41St Street and 49th Street <br /> Action 6.1 —The county Public Works Department will construct sidewalks along 41St Street as part of 41St Street resurfacing project. <br /> Action 6.2 — The county Public Works Department will repair and connect the sidewalk along 43rd Avenue between 41St Street and <br /> 49th Street <br /> Action 6.3 -The county Public Works Department will repair and connect the sidewalk along 45th Street, from 43rd Avenue to U.S. #1. <br /> Objective 7 Street Maintenance <br /> By 2005, all streets in Gifford will be adequately maintained. Adequate maintenance is defined as a ranking of 3 or above on the <br /> Road and Bridge Roadway Maintenance Condition Inventory. <br /> Action 7.1 — The county Road and Bridge Division will, on an annual basis, monitor street conditions in Gifford, rank projects for <br /> resurfacing and/or repair, and undertake high rank projects. A copy of this report will be provided to the Gifford Progressive Civic <br /> League. <br /> Action 7.2 -The Road and Bridge Division will repair or resurface any street with a ranking below 3. <br /> Action 7.3 — The county Public Works Department will widen and resurface 41s' Street, providing sidewalks, turn lanes and other <br /> related improvements. <br /> Action 7.4—The county Public Works Department will resurface 45th Street <br /> Community Development Department Indian River County 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.