My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/06/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
04/06/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:21:18 PM
Creation date
3/23/2016 8:57:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/16/2013
Meeting Body
Board of County Commissioners
Book and Page
161
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N5.tif
SmeadsoftID
14210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 to WORK ORDER NO. 5-RR, AMENDMENT No. 3 <br /> PROFESSIONAL ENGINEERING SERVICES for ADDITIONAL <br /> PERMITTING REQUIREMENTS for the <br /> ROCKRIDGE SUBDIVISION SURGE PROTECTION PROJECT <br /> INTRODUCTION/OVERVIEW <br /> Indian River County (the "County") has requested that Malcolm Pirnie, Inc. (the <br /> "CONSULTANT") perform additional environmental permitting services in order to <br /> secure a permit from the US Army Corps of Engineers (USACE). The additional <br /> USACE environmental permitting services — above the services approved by <br /> Amendments No. 1 and 2 of Work Order Number 5-RR - are required because the <br /> environmental mitigation permitting issues associated with using County owned <br /> property (Earman Island) for this project, at the request of the USACE, are compounded <br /> because an abutting piece of property on the island is also being permitted for another <br /> County mitigation project (Oslo Boat Ramp). Since the CONSULTANT submitted the <br /> proposed Rockridge mitigation plan to the USACE, the adjacent Oslo Boat Ramp <br /> mitigation plan was revised at the request of the USACE. The CONSULTANT must <br /> now revise the proposed Rockridge mitigation plan to accommodate the latest Oslo <br /> Boat Ramp mitigation plan and resubmit it to the USACE. This requires Work Order No. <br /> 5-RR, Amendment No. 3, to be issued for the associated additional engineering <br /> services related specifically to harmonize the activities of the two proposed mitigation <br /> sites. <br /> 1.0 ADDITIONAL ENVIRONMENTAL PERMITTING SERVICES <br /> Provide additional environmental permitting services as necessary to permit the <br /> Rockridge Surge Protection Project with the US Army Corps of Engineers, including but <br /> not limited to modifying the existing Rockridge mitigation plan so it reflects the latest <br /> Oslo Boat Ramp mitigation plan revisions. The activities to address the requirements of <br /> the USACE will require additional manhours by the CONSULTANT to acquire the <br /> USACE permit necessary for this project <br /> **END OF ATTACHMENT 1** <br /> 2 <br /> C:\Users\rawlingsp\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\LTFDOVU8\Amendment 3 to WO <br /> 5-RR-4-2-2013.doc <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.