My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
04/23/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:27:47 PM
Creation date
3/23/2016 8:57:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/23/2013
Meeting Body
Board of County Commissioners
Book and Page
158
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N6.tif
SmeadsoftID
14211
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0- u VY <br /> Indian tRiver County Purchasing Division 1� <br /> �;��� I? <br /> 1800 27 Street <br /> Vero Beach, FL 32960 1 <br /> Phone (772)226-1416 #� <br /> Fax(772) 770-5140 <br /> -oxtt% <br /> Bid Form <br /> Annual Sediment Removal for PC Main <br /> Bid#: 2013023 <br /> Bid Opening Date and Time: APRIL 3,2013 2:00 P.M. <br /> Bid Opening Location: Purchasing Division <br /> 1800 27th Street <br /> Vero Beach, FL 32960 <br /> In accordance with all terms,conditions,specifications,and requirements,the Bidder offers the following: <br /> Item Description Ty�k Unit Unit Total <br /> No. Q Price <br /> Treatment Channel:Provide all labor,tools, <br /> equipment,supplies,utilities,materials,fuel,etc.to <br /> remove all captured material from the treatment <br /> channel and deposit the removed material in the <br /> sediment recovery area,including but not limited to 1 EA00 `a �= <br /> 1 I, <br /> mobilization,demobilization,insurance,managing <br /> the sediment recovery area during the Work and <br /> decanting clear liquid from it,clean up,and related <br /> incidentals. (The depth of material in the treatment <br /> channel is estimated to be approximately 1 foot.) <br /> Sedimentation System:Provide all labor,tools, <br /> equipment,supplies,utilities,materials,fuel,etc.to <br /> remove all captured material from the two sediment <br /> cells and deposit the removed material in the <br /> sediment recovery area,including but not limited to <br /> 2 mobilization,demobilization,insurance,managing 4 EA <br /> the sediment recovery area during the Work and <br /> decanting clear liquid from it,clean up,and related <br /> incidentals. (The storage volume of Cell#1 is <br /> approximately 68 cubic yards and the storage <br /> ` volume of Cell#2 is approximately 80 cubic yards.) <br /> GRAND TOTAL BID(BID ITEM NO.1 plus BID ITEM NO.2 3 S q00 S 9- <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.