Laserfiche WebLink
Indian River Boulevard (41st Street- 53rd Street) Resurfacing <br /> IRC Project No. 1131 <br /> CHANGE ORDER NO. 1 <br /> Description of Itemized Bid Schedule Changes <br /> Item No. Description of Chane Quantity Unit I Unit Price I Price Increase Price Decrease <br /> Indian River Boulvard Resurfacing 41st Street to 53rd Street I.R.C.Project#1131 <br /> 706-3 RPM Bi-Directional Amber/Amber 69 Ea 4.16 $287.04 <br /> 706-3A RPM Bi-Directional (White/Red) 44 EA 4.16 $183.04 <br /> 711-11-121 Thermo Iastic,Traffic,Traffic Stri e,White Solid,6" 213 LF 0.90 $191.70 <br /> 711-11-122 Thermo Iastic,Traffic,Traffic Stri e,White Solid,8" 1071 LF 1.14 $1,220.94 <br /> 711-11-125 Thermo Iastic,Traffic,Traffic Stri e,White Solid,24" 57 LF 4.37 $249.09 <br /> 711-11-221 Thermo Iastic,Traffic Stri e,Yellow,Solid,6" 697 LF 0.91 $634.27 <br /> 711-11-224 Thermo Iastic,Traffic Stri e,Yellow,Solid,l8" 89 LF 3.02 $268.78 <br /> WO#1 18"Foil Tape&Removal of Arrows 1 LS 1,061.50 $1,061.50 <br /> WO#2 Blackout_&Thermo Traffic Stdoe,VV'FIte S2:d...12" i LS 1,026.74 $1,026.74 <br /> 327-70-1 Millinq Exist.Asphalt Pavement 1"Depth 685 SY 1 1.14 $780.90 <br /> 334-1-13 Sue ave Asphaltic,Concrete 1-1/2"SP-9.5 685 SY 7.49 $5,130.65 <br /> 570-1-2 Performance Turf-Sodding Bahia or Match Exist. 3434 SY 2.171 $7,451.78 <br /> 570-1-2A PerformanceTurf-Sodding FloratamorMatch Exist. 3734 SY 3.04 $11,351.36 <br /> 1-11-124 Thermo Iastic,Traffic,Traffic Stri e,White Solid,18" 58 LF 3.02 $175.16 <br /> 711-11-141 Thermo Iastic,Traffic,Traffic Stri e,White Ski ,6" 6'-10' 3435 LF 0.91 $3,125.85 <br /> 711-11-141A Thermo Iastic,Traffic,Traffic Stri e,White Ski ,6" 10'-30' 2389 LF 0.91 $2,173.99 <br /> 711-11-141B Thermo Iastic,Traffic,Traffic Stri e,White Ski ,6" 2'-4' 187 LF 0.90 $168.30 <br /> 711-11-160 Thermo Iastic,Pavement Message(Merge) 1 EA 129.97 $129.97 <br /> 711-11-170B Thermo Iastic,Standard,White,Mer a Arrow 1 EA 88.38 $88.38 <br /> 711-11-221A Thermo Iastic,Traffic Strie,Yellow,Solid,6"Double 50 LF 1.81 $90.50 <br /> 711-11-241 Thermo Iasfic,Traffic Stri e,Yellow,Ski 6"6'-10' 245 LF 0.91 $222.95 <br /> 711-11-241A Thermo Iasbc,Traffic Sbi e,Yellow,Ski ,6"2'-4' 838 LF 0.91 $762.58 <br /> FORCE ACCOUNT 1 1 LS 20,000.00 $20,000.00 <br /> SUBTOTALS $5,123.10 $51,652.37 <br /> TOTAL CHANGE ORDER# 1 -$46,529.27 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1131-IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927Wdmim\construction phase\change order#1\Change Order Form No 1 Revised <br />04-04- <br /> 2013 <br /> 59 <br />