Indian River Blvd(41st St to 53rd Sl) IRC PROJECT NO,1131
<br /> PAY APPLICATION
<br /> SCHEDULED VALUE PREVIOUS APPLICATION THIS PERIOD TOTAL COMPLETED % MATERIALS BALANCE TO FINISH
<br /> It..No. 10..orl Von ..lity URII Unll Prloy - Amount 'QUANTITY Ameunl QUANTITY Amount Unll Prle9 - Amoonl aTORED QUANTITY
<br /> Amounl
<br /> ROADWAY IMPROVEMENTS
<br /> ROADWAY MATERIALS
<br /> 101-1 MOBILIZATION TO INCLUDE PUBLIC CONSTRUCTION E 1 LS 21,846.16 21,846.16 1.00 21,846.16 0.00 1.00 21,846.16 100.00% 0.00 0.00 0.00
<br /> 102-1 MAINTENANCE OF TRAFFIC 1 LS 26,988.70 26,988.70 0.75 20,241.63 0.25 6,747.18 1.00 26,988.70 100.00% 0.00 0.00 0.00
<br /> 104-1 EROSION AND WATER POLLUTION CONTROL 1 LS 2,412.31 2,412.31 1.00 2,412.31 0.00 1.00 2,412.31 100.00% 0.00 0.00 0.00
<br /> 327-70-1 MILLING EXISTING ASPHALT PAVEMENT 1"DEPTH 71,546 SY 1.14 81,562.44 70,861.00 80,781.54 0.00 70,861.00 80,781.54 99.04% 0.00
<br /> 685.00 780.90
<br /> 334-1-13 SUPERPAVE ASPHALTIC CONCRETE 1-1/2"SP-9.5 71,546 SY 7.49 535,879.54 70,861.00 530,748.89 0.00 70,861.00 530,748.89 99.04% 0.00
<br /> 685.00 5,130.65
<br /> 570-1-2 PERFORMANCE TURF-SODDING BAHIA OR MATCH E 3,734 SY 2.17 8,102.78 300.00 651.00 0.00 300.00 651.00 8.03% 0.00 3,434.00
<br /> 7,451.78
<br /> PERFORMANCE TURF-SODDING(FLORATAM OR
<br /> 570-1-2A MATCH EXISTING) 3,734 SY 3.04 11,351.36 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 3,734.00 11,351.36
<br /> 700-20-11 SINGLE POST SIGN <12 W4-2R MERGE 3 AS 306.74 920,22 0.00 0.00 3.00 920.22 3.00 920.22 100.00% 0.00 0.00 0.00
<br /> 706-3 RPM BI-DIRECTIONAL AMBER/AMBER 287 1 EA 1 4.16 1,193.92 0.00 0.00 356.00 1,480.96 356.00 1,480.96 124.04% 0.00 -69.00
<br /> -287.04
<br /> 706-3A RPM BI-DIRECTIONAL WHITE/RED 738 EA 1 4.16 3,070.08 0.00 0.00 782.00 3,253.12 782.00 3,253.12 105.96% 0.00 -44.00
<br /> -183.04
<br /> 711-11-121 THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SOLID,6" 20,805 LF 0.90 18,724.50 0.00 0.00 21,018.00 18,916.20 21,018.00 18,916.20 101.02% 0.00
<br /> -213.00 -191.70
<br /> 711-11-122 THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SOLID,8" 1,513 LF 1.14 1,724.82 0.00 0.00 2,584.00 2,946.76 2,584.00 2,945.76 170.79% O.00
<br /> -1,071.00 -1,220.94
<br /> 711-11-124 THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SOLID,18" 718 LF 3.02 2,168.36 660.00 1,993.20 0.00 660.00 1,993.20 91.92% 0.00 58.00
<br /> 175.16
<br /> 711-11-125 THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SOLID,24" 92 LF 4.37 402.04 149.00 651.13 0.00 149.00 651.13 161.96% 0.00 -57.00
<br /> -249.09
<br /> 711-11-141 THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" 6'-1 3,936 LF 0.91 3,581.76 0.00 0.00 501.00 455.91 501.00 455.91 12.73% 0.00
<br /> 3,435.00 3,125.85
<br /> 711-11-141A THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" 10'- 15,510 LF 0.91 14,114.10 0.00 0.00 13,121.00 11,940.11 13,121.00 11,940.11 84.60%
<br /> 0.00 2,389.00 2,173.99
<br /> 711-11-1418 THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" 2'-4 187 LF 0.90 168.30 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 187.00 168.30
<br /> 711-11-160 THERMOPLASTIC,PAVEMENT MESSAGE MERGE 7 EA 129.97 909.79 6.00 779.82 0.00 6.00 779.82 85.71% 0.00 1.00 129.97
<br /> 711-11-170A THERMOPLASTIC,STANDARD,WHITE,TURN ARROW 64 EA 88.38 5,656.32 64.00 5,655.32 0.00 64.00 51656.32 100.00% 0.00 0.00 0.00
<br /> 711-11-1708 THERMOPLASTIC,STANDARD,WHITE,MERGE ARRO 7 EA 88.38 618.66 1
<br /> 6.00 530.28 0.00 6.00 530.28 85.71% 0.00 1.00 88.38
<br /> F.Wutlb W o,MelEN01NEERINe OIVI910N PgOJECT911191IR GIVE Rew,lecl,q 11e19110 9YE 919EE PROJ 093'ME.Mn1CanYw,x PeyrpPlcell".Wey Appib9lbn N".J
<br />
|