Laserfiche WebLink
(/ INDIAN RIVER COUNTY, FLORIDA <br /> AGENDA ITEM <br /> Department of Public Works <br /> Division of Facilities Management <br /> Date: April 17, 2013 <br /> To: Joseph A. Baird, County Administrator <br /> Thru: Christopher R. Mora, P.E., Public Works Director <br /> From: Lynn Williams, Facilities Manager/Project Manager <br /> Subject : Crime Scene Facility Change Order # 1 <br /> BACKGROUND: <br /> An agreement with Proctor Construction to construct the IRC Crime Scene Facility located at <br /> 3885 41 st Street. was approved by the Board on December 18, 2012. The original contract <br /> amount was for$1,299,317.00. Included within the contract amount is an owner contingency <br /> line item in the amount of$50,000. The contingency was established due to the uncertainty of <br /> renovating an existing structure and possible unforeseen conditions with existing underground <br /> facilities. <br /> The attached Change Order#1 contains a total of 10 items impacting the project. These items <br /> have been accepted by the project team and are brought forward as a single change order for <br /> Board approval. <br /> Change Proposal CSI-002 Deletion of one refrigerated evidence locker. Deduct($11,832.18) <br /> Change Proposal CSI -004 Deletion of gate controller and gate. Deduct($10,243.00) <br /> Change Proposal CSI- 005 Change Security mesh to galvanized coating in exposed areas of <br /> evidence processing garage and evidence storage. Add $10,279.90 <br /> Change Proposal CSI -006 Upgrade existing fire alarm to comply with Fire Prevention permit <br /> comments and allow for monitoring of fire sprinkler system. Add $8,677.57 <br /> Change Proposal CSI -007 Replace existing sanitary sewer line from existing building to lift <br /> station. Elevation of existing line did not allow adequate fall for installation of new plumbing <br /> required within the building. Add $15,961.29 <br /> Change Proposal CSI -008 Provide and install an additional floor outlet in room 108 for <br /> proposed work table. This requires cutting existing concrete floor Add $1,437.64 <br /> Change Proposal CSI-009 Provide and install an additional wall receptacle in Room 108 to <br /> allow for finger print machine. Add $415.46 <br /> Change Proposal CSI -010 Provide and install black acoustical ceiling grid and tile in room <br /> 106 Photography lab. Add 506.64 <br /> Change Proposal CSI -011 Replace portions of the existing concrete parking area with <br /> asphalt. Portions of the existing concrete drive and parking areas are broken and poorly <br /> installed. Add $27,584.38 <br /> Change Proposal CSI-013 Owner Credit from Contingency for the funding of CO#1 <br /> ($42,787.70) <br /> Total Deduct Changes: ($22,075.18) <br /> Total Add Changes: $64,862.88 <br /> Total Change Order#1: $42,787.70 <br /> FAPublic Works\Luanne M\Facilities Management\Sheriff Storage-New Bldg&Future Facility\Change Order#1 1 76 <br /> Crime Scene Project 04-17-13.doc <br />