Laserfiche WebLink
W-7; Proctor <br /> construction Co. Prime Contract Change Order <br /> 2050 US-1,Suite 200 <br /> Vero 8each,Florida 32960 Detailed,Grouped by Each Number <br /> Telephone: (772)234-8164 <br /> ' <br /> Fax:(772)234-8188 <br /> Indian River Crime Scene Investigation Facility Project# IRC-CS101/2013 Proctor Construction Co. <br /> 3885 41st Street Tel: 772.234.8164 Fax: 772.234.8188 <br /> Vero Beach,Florida 32960 <br /> Date: 4/16/2013 <br /> To Contractor: Architect's Project No: <br /> Proctor Construction Co. Contract Date: 1/4/2013 <br /> 2050 Hwy US-1 Suite 200 Contract Number: CSI-028 <br /> Vero Beach,FL 32960 Change Order Number: 001 <br /> The Contract is hereby revised by the following items: <br /> PCO Description Amount <br /> CSI-002 Metal Locker Change (11,832.18) <br /> CSI-004 Deduct for Entrance Gate and Operator (10,243.00) <br /> CSI-005 Security Mesh Change to Galvanized 10,279.90 <br /> CSI-006 Fire Alarm Upgrade 8,677.57 <br /> CSI-007 Provide Sanitary Line from Building to Lift Station 15,961.29 <br /> CSI-008 Provide Electrical&Phone Flush mount floor box in center of CSI Area Room 108 1,437.64 <br /> CSI-009 Provide additional wall receptacle,data telephone box for Finger Printing Machine in CSI 415.46 <br /> Area Room 108 <br /> CSI-010 Provide Black ACT&Grid in Photo Lab Room 106 506.64 <br /> CSI-011 Replace existing concrete drive and parking area with 1.5"asphalt as requested by Owner 27,584.38 <br /> CSI-013 Owner Contingency Credit#1 (42,787.70) <br /> Theoriginal Contract Value was....................................................................................................................... 1,299,317.00 <br /> Sum of changes by prior Prime Contract Change Orders................................................................................ 0.00 <br /> The Contract Value prior to this Prime Contract Change Order was................................................................ 1,299,317.00 <br /> The Contract Value will be changed by this Prime Contract Change Order in the amount of.......................... 0.00 <br /> The new Contract Value including this Prime Contract Change Order will be.................................................. 1,299,317.00 <br /> The Contract duration will be changed by........................................................................................................ 0 Days <br /> The revised Substantial Completion date as of this Prime Contract Change Order is..................................... <br /> Donadio&Associates,Architects Proctor Construction Co. <br /> ARCHITECT CONTRACTOR OWNER <br /> 609 17th Street 2050 Hwy US-1 Suite 200 <br /> Vero Beach, FL 32960 Vero Beach,FL 32960 <br /> Address Address Address <br /> By Anthonyona _'. By Donald Tolliver By <br /> SIG U E SIGNATURE IGNATURE <br /> DATE d 1, ,3 DATE ' 1 j� DATE <br /> Prolog Manager Printed on: 4/17/2013 Prolog Main Office Page 1 <br /> APPROVED AS -T(7) <br /> DEB: <br /> WILLIAM K.DEB L Q <br /> rDEFUTF COU NTY.ATTOR.N[' o <br />