Laserfiche WebLink
Indian River County Phase H Cell I Construction <br /> Vertical Expansion Access Road Ditch Modification <br /> BID FORM <br /> Flexamat Lining Material <br /> Item Description Estimated <br /> Quantity Unit Unit Cost Cost <br /> (Note <br /> 1 Mobilization/Demobilization(Not to exceed 5%of Bid) 1 LS ' <br /> 2 ' Stockpile existing Check Dams(Note II) 1 LS �S� <br /> 3 Subgrade Preparation(Note 11 <br /> 760 iffill 15bo <br /> 4 Earthwork(Fill)(Note IV and V) 800 cy � <br /> 5 Flexamat(Material and Installation)(Note VI) 1,400 sy tic0 <br /> 6 Geogrid(used.to tie 2 rolls of Flexamat together) 1,400 sf 0 <br /> 7 Install•Stockpiled-Check;lams 1 L. ro 1q.;500 <br /> 8 Sodding outside of Flekamat(Note VII) 1,250 sy 14,000 <br /> 9 Initial Survey and Final Survey(Note X) 1 LS = <br /> TOTAL 2 <br /> Notes: <br /> Quantities presented herein are estimated quantities and should be verified by Contractor. If quantities are found to be significantly different, <br /> I Contractor shall notify Construction Manager/Engineer prior to starting work.Quantities not provided and that form a part of the work shall be <br /> estimated and verified by Contractor and brought to Engineer's attention. Payment shall be made on surveyed and calculated quantities in <br /> accordance with the Technical Specifications. <br /> This item involves stockpiling check dams present in the work area as shown on Drawing 2 of 5.This item shall also involve removal of silt <br /> fence and siltation accumulated behind the check dams within and outside(downstream)the work area.Please refer to Drawing 2 of 5. <br /> This item involves clearing/removal of overgrown grass,rocks,sticks,roots,any trash,unsuitable soils etc.present within the ditch and <br /> stripping of.the unsuitable topsoil in the work area.This line item basically involves preparation of subgradetexisting <br /> ground prior to placement <br /> of the import fill on the landfill side slopes and on the access road side slopes as shown on the Construction Drawings <br /> This line item involves earthwork associated with constructing the ditch cross section of 2H:1 V slopes with depth of 2.5 ft,5%slope up to the <br /> IV existing ground with slopes as indicated on the Construction Drawings.The actual quantity may vary due to the on-site conditions.Contractor <br /> to provide a survey from top of prepared subgrade to top of fill for actual as-built quantity of fill utilized. <br /> V Earthwork quantities are in-place compacted quantities.Earthwork pay items include all costs to haul,place,compact,and grade <br /> general/structural fill. <br /> Contractor to follow construction guidelines from the manufacturer and any additional guidelines provided by the engineer for material and <br /> VI installation of Flexamat.Item shall involve application of seed prior to flexamat installation.Flexamat manufacturer and construction notes are <br /> indicated on the Construction Drawings. <br /> VII This item involves sodding of the ditch from crest of flexamat to crest of the access road and the 5%bench on the landfill sideslope as shown <br /> on the Construction Drawings. <br /> Vin This Bid Form is a part of the bid package that involves Technical Specifications,Construction Drawings,Construction Quality Assurance <br /> (CQA)Plan,Manufacturer Guildlines for Flexamat installation,and any other guidelines/instructions provided by the Engineer. <br /> IX Contractor shall submit Request for Additional Information(RAI)for clarifications,if any,related to scope of work,items and/or quantities on <br /> the bid form,and any discrepancy in the bid documents during the bidding process. <br /> X Contractor to perform initial survey after subgrade preparation and a final survey after Flexamat installation.Contractor to provide as-built <br /> survey to the owner.The surveys shall be used for payment purposes and for verification of work completion <br /> 1 of 1 1/25/2013 <br /> 280 <br />