Laserfiche WebLink
1. The existing Article 1 — SCOPE OF WORK of the Contract is modified to include the <br /> following: <br /> LANDFILL ACCESS ROAD DITCH ENHANCEMENT. The Contractor shall undertake and <br /> complete the Landfill Access Road Ditch Enhancement project at the landfill based on <br /> Geosyntec's Project drawings, specifications, and bid form dated January 25, 2013. The <br /> Contractor is authorized to use the services of Golder Associates, Inc. as a subcontractor <br /> on the project. <br /> General Site Preparation <br /> • Mobilization/Demobilization <br /> • Initial/ Final Surveying <br /> • Stockpile Existing Check Dams <br /> • Subgrade Preparation <br /> Ditch Enhancement <br /> • Earthwork <br /> • Flexmat—material and installation <br /> • Geogrid <br /> • Install Stockpiled Check Dams <br /> • Sodding outside of Flexmat Areas <br /> 2. The existing Article 2—TERM OF CONTRACT is modified to include the following: <br /> iii) The Contractor shall be substantially completed with the Landfill Access Road <br /> Ditch Enhancement project at the landfill within 21 calendar days of notice to <br /> proceed. The Contractor shall be at final completion within 30 calendar days of <br /> notice to proceed. Any change in contract time shall be based on authorized and <br /> approved basis. <br /> 3. The existing Article 3—COMPENSATION of the Contract is modified to include the <br /> following: <br /> xiii) Payment for the Landfill Access Road Ditch Enhancement at the landfill will be <br /> $151,435.26 as provided in the proposal by Golder Associates, Inc. in Exhibit #1 <br /> plus the contingency fee and the management fee outlined below. The price <br /> does not include the following: <br /> • Costs for items, which are the subject of, approved change orders, per the <br /> 20% contingency. <br /> 287 <br />