Laserfiche WebLink
i <br /> CHANGE ORDER NO. 1 <br /> DATE OF ISSUANCE: <br /> EFFECTIVE DATE: <br /> OWNER: INDIAN RIVER COUNTY <br /> CONTRACTOR: CLOSE CONSTRUCTION, LLC <br /> PROJECT: Modifications to the Egret Marsh Stormwater Park Floway <br /> OWNER'S PROJECT NUMBER: 0435A <br /> ENGINEER: INDIAN RIVER COUNTY <br /> You are directed to make the following changes in the Contract Documents: <br /> Increase or <br /> Increase/Decrease in <br /> Item Description Decrease in Contract Time <br /> Contract Price <br /> (Calendar Days) <br /> C01-1 Delete vapor barrier, tape, and labor per Attachment No. 1 ($3,089.00) 0.0 <br /> Excavate 2" of existing floway base material instead of 6" per Attachment No. 1. (The finish <br /> C01-2 elevation of the concrete floway surface was raised four inches to decrease the amount of <br /> excavation required to accommodate the concrete thickness. This resulted in less wear and <br /> tear on facility access roadways, reducing by two-thirds the volume of excavated material <br /> transported to the stockpile area.) ($3,268.00) 0.0 <br /> Delete mixing existing material in-place per Attachment No. 1. (This item was not necessary <br /> C01-3 due to the good compaction characteristics of the institu soil.) ($3,250.00) 0.0 <br /> =Items C01-4a through C01-4e-Concrete Floway Design Enhancements, Repairs, and <br /> CO1-4Improvements to Egret Marsh Stormwater Park per Attachment No. 2 $7,754.59 1 0.0 <br /> Cts <br />