My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/2013 (3)
CBCC
>
Meetings
>
2010's
>
2013
>
04/02/2013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2022 9:04:14 AM
Creation date
3/23/2016 8:56:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/02/2013
Meeting Body
Board of County Commissioners
Book and Page
301
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N3.tif
SmeadsoftID
14208
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construct 100 linear feet of FDOT Type "D" concrete curbing along a portion of the north side of <br /> the ATS access driveway. (The existing ATS access driveway is on a steep slope leading to the , ws xti <br /> C01-4e headworks structure, which causes it to experience significant erosion along part of its northern a <br /> edge. As a result, the asphalt has begun to fail along part of the driveway edge. The curbing ;.; t <br /> will prevent a future expensive roadway repair by eliminating further deterioration of the <br /> roadway surface and it will redirect runoff to the bottom of the slope where it will be safely <br /> dispersed.) k L <br /> Delete 80 Florida Bearing Value (FBV)tests of the floway subgrade material. (All FBV tests were <br /> C01-5 deleted at the recommendation of GFA International, Inc., the geotechnical engineering and <br /> testing firm. GFA stated that in its professional opinion, FBV tests were not required for the <br /> concrete floway subgrade compaction, and that other originally specified density tests would <br /> supply all necessary subgrade compaction information.) See Attachment No. 3. ($1,760.00) 0.0 <br /> Construct a 24"x15'x6" thick, 4,000 psi slab with fibermesh adjacent to the west edge of the <br /> C01-6 southern pole barn at$40/SY $1,600.00 0.0 <br /> TOTALS ($2,012.41) 0.0 <br /> CHANGE IN CONTRACT PRICE <br /> Description Amount <br /> Original Contract Price $1,288,482.00 <br /> Net increase/decrease from previous Change Orders $0.00 <br /> Contract Price prior to this Change Order $1,288,482.00 <br /> Net increase/decrease of this Change Order ($2,012.41) <br /> Contract Price with all approved Change Orders $1,286,469.59 <br /> CHANGE IN CONTRACT TIME (Calendar Days) <br /> Description Amount <br /> Original Contract Time for Final Completion 116.0 <br /> Net increase/decrease from previous Change Orders 0.0 <br /> C3'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.