My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/2013 (3)
CBCC
>
Meetings
>
2010's
>
2013
>
04/02/2013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2022 9:04:14 AM
Creation date
3/23/2016 8:56:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/02/2013
Meeting Body
Board of County Commissioners
Book and Page
301
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N3.tif
SmeadsoftID
14208
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t e�4 <br /> It 1�Ti A� } V\(-:N-T <br /> ; <br /> Construction, LILC CHANGE <br /> ORDER <br /> PROJECT: Modifications to the Egret Marsh CHANGE ORDER NUMBER: 3 <br /> (Name.ad;iress) 7295 4th Street. -- DATE: ------- — - <br /> ---___- _ 1 .30.2013 <br /> !Fero Beach. FL: ARCHITECT'S PROJECT NO 0435A <br /> CONTRACT DATE: 1 1.07.201 2 <br /> CONTRACTOR: Close Construction, LLC CONTRACT FOR: <br /> (Name. address) 301 N. W. 4th Ave. <br /> Okeechobee, FL 34972 <br /> The Contract is changed as follows: <br /> The addition of labor, equipment and materials to complete the following: <br /> 1- Construction of an FDOT Type D Curb <br /> 2. Construct a concrete curb on both sides of the harvest access ramp <br /> 3. Construct a reinforced concrete ramp <br /> 4. Place concrete around leaking underground pipe connections <br /> 5. Construct concrete curbs at each side of the effluent end of the floway <br /> Drawdy Concrete Construction (See attached breakdown) $6,016.12 <br /> Close Construction, LLC (See attached breakdown) $727.00 <br /> Overhead and Profit (15%) $1,011.47 <br /> Total: $7,754.59 <br /> Change Order Total: $7,754.59 <br /> The original(Contract Sum)(Guaranteed Maximum Price)was................................................$ 1,288,482.00 <br /> Net change by previously authorized Change Orders..... .........._.................:. .......................S 0.00 <br /> The(Contract Sum)(Guaranteed Maximum Price)prior to this Change order was.........................$ 1,288,482.00 <br /> The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) <br /> (unchanged)by this Change Order in the amount of...........................................................$ 7,754.59 <br /> T he new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be..........-$ 11,296,236.59 <br /> The Contract Time will be(increased)(decreased)(unchanged)by ( )days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is <br /> NOTE This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have <br /> been authorized by Construction Change Directive. <br /> ___..�_....._-._...._ —_........_.._— _ _._._-_-.__..__-.._ ------- ..._- - -_.._...-...- - _ -- <br /> OWNER CONTRACTOR <br /> Indian River County Close Construction, LLC <br /> Address Address - <br /> ------- <br /> A-:801 27th Street 301 N.U•? 4th Ave.. — <br /> Vero Beach. FL Okeechobee.FL 34972 <br /> BY BY <br /> ------------- <br /> DATE --- — DATE � — <br /> --------- - <br /> 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.