My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/14/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
05/14/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 1:48:19 PM
Creation date
3/23/2016 8:57:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/14/2013
Meeting Body
Board of County Commissioners
Book and Page
87
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N8.tif
SmeadsoftID
14213
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 -Agreement(Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specifie indii in the Contract <br /> Documents. The Work is generally described as follows: <br /> The proposed improvements to CR-51. nsist of reZ.C 'shineell depth <br /> reclamation) of the dual eastbound lanes , tQ: Ros d Road to t. Also <br /> included with the project is the installat' ' icu a etector ass I ies and the <br /> signing and marking of the proposed re : ced a oun es. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for whip " Work un the tract ments may be the whole or only a <br /> part is generally de follows. <br /> Pro'.. ct Name: 2 g (East Bound Only) <br /> (Ros d Ro ,° asy Street) <br /> Cod Numb 32 <br /> Bid N er. 06 <br /> Project dress 2 SeI stian, Florida <br /> ARTI 3— ENGINEE <br /> 3.01 Th o Public Works Department is hereinafter called the ENGINEER <br /> and will act as E s representative, assume all duties and responsibilities, and have <br /> the rights and au rity assigned to ENGINEER in the Contract Documents in connection <br /> with the co of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 120t`' day after the date when <br /> the Contract Times commence to run as provided in paragraph 2.03 of the General <br /> 00520-Agreement(Public Works)SAMPLE.doc <br /> 00520.2 3 5 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS11132-CR 512 Eland Resurfacing Roseland Rd to Easy St-SEE PROJ 0926\Admim\agenda items100520-Agreement <br /> (Public Works)SAMPLE.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.