ARTICLE 7 - INDEMNIFICATION
<br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with
<br /> paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract.
<br /> ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br /> following representations:
<br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the
<br /> other related data identified in the Bidding Documents.
<br /> B. CONTRACTOR has visited the Site and become famil ith and is satisfied as to the
<br /> general, local, and Site conditions that may affect cost, pr, . : ss, erformance of the
<br /> Work.
<br /> C. CONTRACTOR is familiar with and is satisfied all federal, s and to aws and
<br /> Regulations that may affect cost, progres d pe k. ance of the
<br /> D, CONTRACTOR has carefully Stu all: epo f explo ions and tests of
<br /> subsurface conditions at or contiguo the Sit d all 1, in physical conditions
<br /> in or relating to existing surf ' or su ace ctures k ntiguous to the Site
<br /> (except Underground Faciliti ich en identifie `in the Supplementary
<br /> Conditions as provided in para ; 02 of : General Conditions and (2) reports and
<br /> drawings of a Hazardous Enviro a ondl r if any, at the Site which have been
<br /> identified in the Sup: - . entary Co do s pro in paragraph 4.06 of the General
<br /> Conditions.
<br /> NNW
<br /> E. CONTRACTOR has ob -d y Stu d (or assumes responsibility for having
<br /> done so) itional or = - eme aminations, investigations, explorations, tests,
<br /> studies, an cerning itions ace, subsurface, and Underground Facilities)
<br /> at or contigu t 'te whl ay affect cost, progress, or performance of the Work
<br /> o ich rela to a ct o e means, methods, techniques, sequences, and
<br /> dures of str. employed by CONTRACTOR, including applying the
<br /> ecific means, tech es, sequences, and procedures of construction, if any,
<br /> ressly, uired` the Contract Documents to be employed by CONTRACTOR, and
<br /> S a x rograms incident thereto
<br /> F. CONTRACTOR es not consider that any further examinations, investigations,
<br /> explorations, tes tudies, or data are necessary for the performance of the Work at the
<br /> Contract P in the Contract Times, and in accordance with the other terms and
<br /> conditions of the Contract Documents.
<br /> G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
<br /> others at the Site that relates to the Work as indicated in the Contract Documents.
<br /> H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br /> observations obtained from visits to the Site, reports and drawings identified in the
<br /> Contract Documents, and all additional examinations, investigations, explorations, tests,
<br /> studies, and data with the Contract Documents.
<br /> ,ftw� I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or
<br /> discrepancies that CONTRACTOR has discovered in the Contract Documents, and the
<br /> written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
<br /> 00520-Agreement(Public Works)SAMPLE.doc
<br /> 00520-5 ^
<br /> F:\PublicWorkskENGINEERING DIVISION PROJECTS11132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St-SEE PROD 0926V�dmim\agenda items\00520-Agreement XV
<br /> (Public Works)SAMPLE.doc
<br />
|