My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
05/07/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:01:03 PM
Creation date
3/23/2016 8:57:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/07/2013
Meeting Body
Board of County Commissioners
Book and Page
339
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N7.tif
SmeadsoftID
14212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br /> BOARD MEMORANDUM <br /> TO: Joseph A. Baird, <br /> County Administrator <br /> THROUGH: Christopher R. Mora, P.E. Cee--o <br /> Public Works Director <br /> FROM: James D. Gray,Jr. <br /> Coastal Engineer <br /> SUBJECT: Work Order No. 1 Coastal Planning and Engineering, Inc. <br /> Sector 3 Beach Restoration Project <br /> Post Construction Physical Monitoring Services <br /> DATE: April_25, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> On March 19, 2013 the Board approved a contract with Coastal Planning and Engineering, Inc. <br /> (CPE) for professional coastal engineering services in Indian River County for a two-year term, <br /> 2013-2015. CPE is the selected County consultant for professional physical monitoring services <br /> .• related to the Sector 3 Beach Restoration Project. <br /> The proposed Work Order No. 1 provides year 2013 post construction physical monitoring <br /> services to document the fill performance of the Sector 3 Beach Restoration Project Area. By <br /> Permit, annual Post Construction Physical monitoring is required for 3 years following a large <br /> scale beach restoration project. The 2013 monitoring entails the following: <br /> • "Year 3" annual post construction physical monitoring of the Phase 1 project area, <br /> • "Year 2" annual post construction physical monitoring of the Phase 2 project area, and <br /> • "Year 1" annual post construction physical monitoring of the Phase 2b project area. <br /> Work Order No. 1 totals a lump sum amount of$53,399.10. <br /> All subsequent annual physical monitoring of the Sector 3 Project area will be addressed <br /> through future work orders. <br /> F:\Public Works\JamesG\Sector 3\CPE Work Orders\Work Order No. 1 -2013 Physical Monitoring\Agenda <br /> Item\agenda item Coastal Planning and Engineering Work Order#1.docx <br /> 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.