My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
05/07/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:01:03 PM
Creation date
3/23/2016 8:57:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/07/2013
Meeting Body
Board of County Commissioners
Book and Page
339
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N7.tif
SmeadsoftID
14212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eArlibi 'I <br /> April 12,2013 <br /> Rev April 16,2013 <br /> James Gray <br /> Indian River County <br /> Public Works - Coastal Engineering Division <br /> 1801 27th St,Building A <br /> Vero Beach, FL 32960 <br /> Subject: Indian River County Sector 3 Beach and Dune Restoration <br /> Post Construction Physical Monitoring Services-2013 <br /> Dear James: <br /> This proposal outlines a scope of work for Coastal Planning&Engineering,Inc. (CPE) to provide services in support <br /> of one year of annual physical monitoring to fulfill FDEP and USACE permit requirements of the Sector 3 Beach and <br /> Dune Restoration Project. This proposal also includes a third party peer review of the UMAM Analysis performed by <br /> CSA,and if necessary,quantification of hardbottom impacts. <br /> The 2013 Physical Monitoring Services entails the following: <br /> • "Year 3"annual post construction physical monitoring of the Phase 1 project area (R-36—R-55), <br /> • "Year 2"annual post construction physical monitoring of the Phase 2 project area (R-26+500—R-36),and <br /> • "Year 1"annual post construction physical monitoring of the Phase 2b project area (R-20—R-26+500). <br /> Physical Monitoring Report <br /> The Indian River County Sector 3 Beach and Dune Restoration Project was constructed under permitting authority of <br /> the Florida Department of Environmental Protection (FDEP) and United States Army Corps of Engineers (USACE). <br /> These permits (FDEP permit No. 0285993-001-JC and USACE Permit SAJ-2007-01645) contain permit conditions <br /> pertaining to construction and post-construction periods. FDEP permit condition 56 (d) requires an engineering <br /> report be submitted to the FDEP within 90 days following completion of each post-construction survey. <br /> We understand that Morgan& Eklund will perform the physical monitoring from R-30 to R-60, and be responsible <br /> for certifying the survey data and submitting a survey report to the FDEP. Land &Sea Surveying Concepts,Inc.,via <br /> a separate contract with the Sebastian Inlet District,will perform the physical monitoring from R-20 to R-30. They <br /> will certify the survey data and submit a separate survey report to the FDEP. CPE will review both data sets to <br /> ensure that it conforms to the standards required by the FDEP physical monitoring plan. CPE will notify the County <br /> of any issues with the survey data and will participate in a conference call with the County, Morgan & Eklund, and <br /> Land&Sea Concepts to discuss any issues. <br /> CPE will develop an engineering report that discusses the performance of the beach fill project. We will analyze <br /> shoreline and volumetric changes throughout the project area,identifying erosion and accretion patterns. The results <br /> will be analyzed for patterns, trends or changes between annual surveys as well as cumulatively since construction. <br /> 2481 NW BOCA RATON BOULEVARD, BOCA RATON, FL 33431 <br /> 561.391.8102 • FAX 561.391.9116 • COASTAL PLANNING & ENGINEERING, INC., A CB&I COMPANY 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.