My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/07/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
05/07/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:01:03 PM
Creation date
3/23/2016 8:57:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/07/2013
Meeting Body
Board of County Commissioners
Book and Page
339
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004N7.tif
SmeadsoftID
14212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Necessary ground control will be extracted from existing imagery sources and used in combination with collected <br /> ABGPS to rectify this imagery. It is assumed that previous control points can be used and have been previously <br /> surveyed. No additional field work is included in this proposal. <br /> Deliverables <br /> CPE will provide the following deliverables: <br /> 1. Two sets of color 9"x9"photography from R-15 to R-60 (one for the County and one for FDEP). <br /> 2. Camera Calibration report for camera used for this task contained on the CD-ROM. <br /> 3. Individual orthorectified frames of each project and reference in an uncompressed Geotiff format stored <br /> on CD-ROM or DVD. <br /> 4. JPEG of mosaicked images. <br /> Required Data <br /> CPE may require additional survey points to rectify the images. We are proposing to sub-contract Aerial <br /> Cartographirs of America (ACA),who previously performed the work and they should have sufficient historic survey <br /> points to rectify the images. However, additional survey points may be required. Typically, the Public Works <br /> Department will have surveys that can be used to rectify aerial images avoiding additional field work. <br /> Schedule <br /> We will attempt to time collection of the aerials to coincide with collection of the survey data. Final deliverables <br /> related to the aerials will be submitted within 30 days of collection of the aerials. <br /> Cost <br /> The cost to collect the aerials and rectify the images is $15,763.10. A breakdown of the hours and expenses to <br /> develop these costs is attached and follow the terms of CPE's agreement with Indian River County. <br /> Third Party Review of UMAM <br /> We understand that Continental Shelf Associates (CSA)will be performing a Uniform Mitigation Assessment Method <br /> (UMAK evaluation for the Sector 3 Beach and Dune Restoration Project. The UMAM rule (Chapter 62-345,F.A.C.) <br /> went into effect on February 2,2004 and is used by the FDEP to determine the amount of mitigation needed to offset <br /> adverse impacts to wetlands and other surface waters and to determine mitigation bank credits awarded and debited. <br /> A CPE biologist will evaluate the UMAM analysis to ensure it was prepared in accordance with FDEP guidelines and <br /> instructions contained in rule 62-345, F.A.C. CPE will prepare a summary of their findings from this review to be <br /> submitted to the County. CPE will participate in a conference call with the County and CSA to discuss any issues <br /> identified during our review. <br /> Required Data <br /> Electronic data (preferably GIS database)may be required to quantify changes in hardbottom area. <br /> 2481 NW BOCA RATON BOULEVARD, BOCA RATON, FL 33431 <br /> 561.391.8102 • FAX 561.391.9116 • COASTAL PLANNING & ENGINEERING, INC., A CB&I COMPANY <br /> 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.