Laserfiche WebLink
OUTLINE SPECIFICATIONS <br /> Division 1 General Conditions <br /> The project, in general, consists of the construction of work as described herein <br /> Design and engineering— by Donadio &Assoc. Architects <br /> Construction & Project Management—performed by Summit Construction Management: <br /> • Supervision and project management as required <br /> • Scheduling and quality control <br /> • Progress meetings, progress scheduling, payment applications, etc. <br /> • All punch list and warranty services, as per contract <br /> • Procurement of materials and services only to LOCAL, <br /> subcontractors/vendors <br /> • Security and safety during construction operations <br /> Costs for Construction Work Include: <br /> • Construction workers, site superintendent, and project manager <br /> • General conditions include field supervision, dumpsters, temporary <br /> protection, small tools, common labor,temporary fencing/signage, <br /> temporary toilets, soil/concrete testing, final cleaning, equipment rentals <br /> • Receive and unload materials <br /> • All direct subcontracted material, labor and equipment <br /> • Costs for insurances and benefits of on-site staff <br /> • Rental of materials, supplies and equipment for mobilization and <br /> construction <br /> • Standard liability and Work Comp Insurance included (No Builder's Risk, can <br /> be added at additional cost) <br /> • No Bonds included (can be added if desired at additional cost) <br /> • No impact fees or utility connection fees included <br /> • IRC building permits (with required five sets of signed/sealed plans by <br /> Donadio &Assoc.) <br /> • Sales and use taxes <br /> • Temporary water and electric to be provided by owner <br /> • Cost of plan reproduction and mailings <br /> • Standard monthly AIA billing with 10% retainage withheld <br /> All change orders will include a 15%Contractors Fee <br /> Phone(772)79"-2099 au-wsuruuitcm.ner Fax(772)794-2097 <br /> 47 <br />