Laserfiche WebLink
� t <br /> • Interior partitions and drywall <br /> • Painting of drywall <br /> • Electrical, per plans <br /> • Anchor bolts <br /> • Pre-engineered metal buildings drawings <br /> TOTAL: $154,000.00 <br /> NOTINCLUDED <br /> • Design and engineering <br /> • Bonding <br /> • Impact fees <br /> • Testing of soil, density and concrete by Owner <br /> • Fencing and removal of existing fence <br /> • Waterproofing <br /> • Floor finishes or concrete sealer <br /> • Site concrete <br /> • Sitework <br /> • Plumbing, A/C <br /> ****Prices are good for 30 days**** <br /> PAYMENT SCHEDULE: Invoices due 10 days after date of invoice. All past due amounts are subject to 2% <br /> per month late charge. <br /> All agreements are contingent upon strikes, accidents or delays beyond our control. All work is to be <br /> completed in a workmanlike manner. Any alteration or deviation from above specifications involving extra <br /> Co <br /> sts will be executed only upon written orders, and will become an extra charge over and above the estimate. <br /> iis proposal is subject to acceptance within 30 days and is void thereafter at the option of the undersigned. <br /> RF CONCRETE CONSTRUCTION, INC. <br /> Authorized Signature: <br /> ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are hereby accepted. You <br /> are authorized to do the work as specified. <br /> DATE OF ACCEPTANCE: SIGNATURE: <br /> L <br /> IRC Jail Warehouse Expansion 2 <br /> Proposal <br /> 52 <br />