My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
06/18/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:08:50 PM
Creation date
3/23/2016 8:58:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2013
Meeting Body
Board of County Commissioners
Book and Page
347
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NE.tif
SmeadsoftID
14219
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(W We will explain how the project will affect the coastal system. It is envisioned that the Preliminary Project Design and <br /> Feasibility Report will provide much of the support for this portion of the permit application discussion. <br /> We will describe the envisioned construction methodology and how turbidity control measures will be instituted to <br /> minimize adverse effects to water quality. We will also explain methods to protect threatened and endangered species. <br /> We will refer to the Environmental Monitoring Plan and the latest Environmental Monitoring'Report regarding future <br /> monitoring requirements and mitigation planning. <br /> The County will be responsible for the JCP application fee. This cost is not included in CPE's cost for this work. <br /> We will complete the Notice of Receipt. <br /> We will follow guidance provided by the FDEP with respect to the filing convention and submittal requirements. We <br /> will follow-up with the FDEP to ensure receipt and distribution of the JCP application. We will also document the <br /> timeline for review and attempt to provide unofficial responses when and where possible to avoid Requests for <br /> Additional Information. <br /> The FDEP and USACE will issue a public notice. The USACE will generally issue the public notice themselves but <br /> ask for assistance with ensuring the notice is correct. The FDEP will return a public notice and request that the <br /> County publish it in the local newspaper and then submit documentation that it was published. CPE will coordinate <br /> with the agencies regarding the public notice. It is assumed that the County has a contract with the local newspaper(s) <br /> and will address the FDEP publication requirements. <br /> Deliverables <br /> The JCP permit application and the associated attachments will be submitted to the County and FDEP as follows. <br /> 1. Four (4) hard copies of the permit application package will be prepared. One original and two copies are <br /> submitted to the FDEP. The last copy will be for the County's records. <br /> 2. An electronic copy of the application will be submitted on three DVD's (2 for the agencies and one for the <br /> County). <br /> Schedule <br /> It is estimated that 45 days will be required to complete the permit application and develop the necessary <br /> documentation once the pre-application meetings are held. <br /> Cost <br /> The cost to develop and submit the permit application package is $22,598. A breakdown of the hours and expenses <br /> to develop these costs is attached and follow the terms of CPE's agreement with Indian River County. <br /> Response to Requests for Additional Information <br /> The FDEP has 90 days to review the application and either issue a Notice of Intent to issue the permit or issue a <br /> Request for Additional Information (RAI). FDEP RAIs will also include comments from the Florida Fish and <br /> Wildlife Conservation Commission,other State agencies and the general public. <br /> 2481 NW BOCA RATON BOULEVARD, BOCA RATON, FL 33431 <br /> 561.391.8102 • FAX 561.391.9116 • COASTAL PLANNING & ENGINEERING, INC., A CB&I COMPANY 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.