My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/18/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
06/18/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:08:50 PM
Creation date
3/23/2016 8:58:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/18/2013
Meeting Body
Board of County Commissioners
Book and Page
347
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004NE.tif
SmeadsoftID
14219
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA • <br /> BOARD MEMORANDUM <br /> r <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH:kChristopher R. Mora, P.E., Public Works Direct <br /> Christopher J. Kafer,Jr., P.E., County Engine <br /> Michael D. Nixon, P.E., Roadway Production Managerol <br /> FROM: Arjuna Weragoda, P.E., Project Engineer Aw <br /> SUBJECT: Civil Engineering and Land Surveying Agreement for <br /> Bridge Replacements and Widening of 66th Avenue from <br /> South of SR60 to North of 57th Street, AMENDMENT NO. 13 <br /> IRC Project No. 0545 <br /> DATE: June 6, 2013 <br /> DESCRIPTION AND CONDITIONS <br /> Arcadis US, Inc. (formally known as Arcadis G&M, Inc)is under contract with Indian River Countyto <br /> provide Civil Engineering and Land Surveying Services for Bridge Replacements and Widening of <br /> 66th Avenue from South of SR60 to North of 57th Street. The original Agreement was approved by <br /> (W the Board of County Commissioners on September 6,2005 in the amount of$631,700.00. Twelve <br /> amendments have been approved to date, bringing the total to $2,183,887.21. <br /> Amendment No. 13 provides for design changes needed during the construction phase of the <br /> project. The changes outlined in the subject amendment are primarily changes to the water main <br /> and re-use water mains. The Engineer will perform an inspection once a week to satisfy the <br /> construction completion certification required by FDEP. Also included in the amendment is the <br /> extension of the water main on 33rd Street approximately 500-LF to the west. <br /> Unforeseen modifications to the construction plans have been performed and the approved <br /> construction engineering allowance has been significantly reduced. Since the project is in the early <br /> stage of completion, an hourly not-to-exceed amount of $20,000 is requested for any further <br /> unexpected design related services. <br /> The total cost for Amendment No. 13 is an hourly not-to-exceed amount of$30,446.24 for <br /> construction related services, in which $10,446.24 is construction related services for Utilities <br /> and $20,000.00 for Public Works. The Amendment raises the total contract amount from <br /> $2,183,887.21 to $2,214,333.45. <br /> (W <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St(Arcadis)1Admim\agenda items\Amendment No.13 <br /> June 18 2013.doc <br /> 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.